Install, Connect
Attach heat shield to exhaust manifold - tightening torque 8 Nm / 6 lbf. ft.
Fasten coolant pipe to cylinder head - tightening torque 15 Nm / 11.1 lbf. ft.
Attach engine transport shackle to cylinder head - tightening torque 20 Nm / 15 lbf. ft.
In X 18 XE, X 20 XEV: install secondary air metal pipe - see operation "Secondary Air Metal Pipe, Remove and Install (X 18 XE, X 20 XEV)" in group "L".
Notice:
Before assembling components of the intake system (hoses, connections, etc.), they must be cleaned of any possible contamination (grease, oil, etc.). When tightening the hose clamps, be sure to observe exactly the tightening torque of 3.5 Nm / 2.6 lbf. ft.
Important!
It is only ensured that the intake system is free of leaks, thus ensuring operational safety of the engine, if the hose clamps are tightened correctly to the prescribed tightening torque.