Workshop Manuals Factory service & repair Vauxhall
01 General Vehicle Information02 Maintenance, Body and Chassis Sheet Metal Parts, Frame03 Paint04 Body Equipment05 Heating, Ventilation, Air Conditioning (HVAC)06 Front Wheel Suspension, Wheels and Tyres07 Rear Axle and Rear Wheel Suspension08 Brakes09 Engine and Engine Aggregates10 Clutch and Transmission11 Fuel and Exhaust System12 Steering13 Electrical Equipment and Instruments14 Accessories
Vauxhall Vectra B13 · Electrical Equipment and Instruments
13 · Electrical

Time allowances

Make
Vauxhall
Model
Vectra B
Section
Wiring Harnesses › Labour Time Allowances › Time allowances
Electrical Equipment and InstrumentsTime allowances

 

 

 

 

Time Allowance  

Number of cables  

Type 1  

Type 2  

Type 3  

Type 4  

Type 5  

 

Repairing cables 1)  

Replacing plug casings  

Replacing individual spring-finger connectors  

Replacing plug casings and spring-finger connectors  

Replacing complete wiring harness plugs  

 

Time allowance  

1  

.2  

.1  

.2  

.2  

.2  

2  

.4  

 

.3  

.4  

.2  

3  

.6  

.2  

.5  

.6  

.4  

4  

.7  

 

.6  

.7  

.5  

5  

.8  

.2  

.7  

.9  

.6  

6  

.9  

 

.9  

1.1  

.7  

7  

1.1  

 

1.1  

1.3  

.8  

8  

1.2  

.3  

1.2  

1.5  

.9  

9  

1.4  

 

1.3  

1.7  

1.0  

10  

1.6  

 

1.5  

1.8  

1.2  

11  

1.7  

.4  

1.7  

2.0  

1.2  

12  

1.9  

 

1.8  

2.2  

1.3  

  

1)  Time allowances apply for repairs involving insertion of a cable section (two cable ends).  

  

 

Number of cables  

Type 1  

Type 2  

Type 3  

Type 4  

Type 5  

 

Repairing cables 1)  

Replacing plug casings  

Replacing individual spring-finger connectors  

Replacing plug casings and spring-finger connectors  

Replacing complete wiring harness plugs  

 

Time allowance  

13  

2.0  

 

1.9  

2.4  

1.5  

14  

2.2  

.5  

2.1  

2.6  

1.6  

15  

2.3  

 

2.2  

2.7  

1.7  

16  

2.5  

 

2.4  

2.9  

1.8  

17  

2.7  

 

2.5  

3.1  

1.9  

18  

2.8  

.6  

2.7  

3.2  

2.1  

19  

2.9  

 

2.8  

3.5  

2.2  

20  

3.1  

 

3.0  

3.7  

2.2  

21  

3.2  

 

3.1  

3.8  

2.4  

22  

3.4  

.7  

3.2  

4.0  

2.5  

23  

3.6  

 

3.4  

4.2  

2.6  

24  

3.7  

 

3.6  

4.4  

2.7  

25  

3.9  

.7  

3.7  

4.6  

2.8  

26  

4.0  

 

3.8  

4.7  

2.9  

  

1)  Time allowances apply for repairs involving insertion of a cable section (two cable ends).  

  

 

Number of cables  

Type 1  

Type 2  

Type 3  

Type 4  

Type 5  

 

Repairing cables 1)  

Replacing plug casings  

Replacing individual spring-finger connectors  

Replacing plug casings and spring-finger connectors  

Replacing complete wiring harness plugs  

 

Time allowance  

27  

4.2  

 

4.0  

4.9  

3.1  

28  

4.3  

.8  

4.2  

5.1  

3.2  

29  

4.5  

 

4.2  

5.2  

3.2  

30  

4.7  

 

4.4  

5.4  

3.3  

31  

4.7  

 

4.5  

5.6  

3.4  

32  

4.9  

.9  

4.7  

5.7  

3.5  

33  

5.0  

 

4.7  

5.9  

3.7  

34  

5.1  

 

4.9  

6.1  

3.7  

35  

5.2  

 

5.1  

6.2  

3.8  

36  

5.3  

1.0  

5.2  

6.4  

3.9  

37  

5.5  

 

5.3  

6.6  

4.0  

38  

5.6  

 

5.4  

6.7  

4.1  

39  

5.7  

1.1  

5.6  

6.9  

4.2  

40  

5.8  

 

5.7  

7.1  

4.3  

  

1)  Time allowances apply for repairs involving insertion of a cable section (two cable ends).  

When replacing spring-finger connectors with two or more cables, please increase the permissible time allowance by .2 hours per additional cable.  

Parts & tools for this job For Vauxhall Vectra

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.