Workshop Manuals Factory service & repair Volkswagen
01 5-cylinder diesel engine02 4-cylinder diesel engine (common rail)03 4-cylinder diesel engine (distributor-type injection pump)04 Running gear: Guide for using trailers05 Wheels and Tyres Guide - General Information06 Running gear: Guide for increasing and decreasing load ratings07 Running gear, axles, steering08 Wheels and Tyres Guide09 Brake systems10 Electrical system11 General body repairs, exterior12 General body repairs, interior13 Heating, air conditioning
Volkswagen LT Mk2 (1996-2006)01 · 5-cylinder diesel engine
01 · Engine

Procedure

Make
Volkswagen
Model
LT Mk2
Year
1996–2006
Section
Checking components and functions › Procedure
5-cylinder diesel engineProcedure

Procedure

electrical system

Remove front left headlight and turn signal: electrical systemRep. Gr.94Lights, bulbs, switches - exterior.

Switch off ignition.

Vehicles with a 68-pin control unit

Release connector on engine control unit and pull off connector.

Connect test box V.A.G 1598/18 to control unit wiring harness.

N23-0058

Vehicles with a 121-pin control unit

Release connector on engine control unit and pull off connector.

Connect test box V.A.G 1598/31 to control unit wiring harness.

N23-0427

Note

  • Test box is arranged so hat it can be connected to engine control unit. Whether or not the engine control unit itself also needs to be connected to the test box is described in the respective repair procedure.

Continuation for all vehicles

Further measures see repair procedures.

Note the following after reconnecting engine control unit:

Install front left headlight and turn signal: electrical systemRep. Gr.94Lights, bulbs, switches - exterior.

Check headlight adjustment and correct if necessary MaintenanceBooklet.

Parts & tools for this job For 1996 Volkswagen LT

As an Amazon Associate we earn from qualifying purchases.