Test procedure
Switch off ignition.
Connect test box V.A.G 1598/18 to control unit wiring harness → Chapter.
Bridge connector contacts 42+46 using cables from auxiliary test set V.A.G 1594 C
Measure voltage between following sockets: 45+1, 68+1, 23+1 and 23+24: Specification: approx. battery voltage.
Connect test box V.A.G 1598/31 to control unit wiring harness → Chapter.
Measure voltage between following sockets, specification: approx. 0 V:
1+4, 1+5, 1+38
2+4, 2+5, 2+38
37+4, 37+5, 37+38
Switch on ignition.
Measure voltage between following sockets, specification: approx. battery voltage:
1+4, 1+5, 1+38
2+4, 2+5, 2+38
37+4, 37+5, 37+38
If specification is not attained:
Check terminal 30 voltage supply relay J317.
Check wiring connections for open circuit, short circuit and transfer resistance at contacts referring to current flow diagram.
If no fault is found in wiring and relay:
Renew diesel direct injection system control unit J248. Chapter
Parts & tools for this job For 1996 Volkswagen LT
- PARTGlow plugsSearch: Volkswagen LT 1996 glow plugs
- TOOLGlow plug socketSearch: glow plug socket
- TOOLDiesel compression testerSearch: diesel compression tester
As an Amazon Associate we earn from qualifying purchases.