Workshop Manuals Factory service & repair Volkswagen
01 5-cylinder diesel engine02 4-cylinder diesel engine (common rail)03 4-cylinder diesel engine (distributor-type injection pump)04 Running gear: Guide for using trailers05 Wheels and Tyres Guide - General Information06 Running gear: Guide for increasing and decreasing load ratings07 Running gear, axles, steering08 Wheels and Tyres Guide09 Brake systems10 Electrical system11 General body repairs, exterior12 General body repairs, interior13 Heating, air conditioning
Volkswagen LT Mk2 (1996-2006)01 · 5-cylinder diesel engine
01 · Engine

Test procedure

Make
Volkswagen
Model
LT Mk2
Year
1996–2006
Section
Checking components and functions › Test procedure
5-cylinder diesel engineTest procedure

Test procedure

Connect vehicle diagnosis, testing and information system VAS 5051Chapter. When doing this, the engine must be running at idling speed.

Press key “08 - Read measured value block” on display.

Press key 7 for “Display group number 7” and confirm entry with Q key.

Display
group
Display
zone
Indicated on display
7115.4 °C
2
315.9 °C
416.9 °C

If no realistic display appears in display zone 1 or a substitute temperature of -5.4 °C is displayed, check fuel temperature sender G81 and wiring to sender as follows:

Press key ← twice.

Press function “06-End output”.

Switch off ignition.

Disconnect connector for fuel temperature sender G81 (connection to injection pump metering system).

Vehicles with a 7-pin injection pump connector

Measure sender resistance at connector contacts 4+7 (1).

N23-0104

Vehicles with a 10-pin injection pump connector

Measure sender resistance at connector contacts 4+7 (1).

N23-0226

Continuation for all vehicles

Specification see diagram

N24-0157

Area A shows resistance values for temperature range 0...50°C and area B the values for temperature range 50...100°C.

Examples:

30 °C corresponds to a resistance from 1500...2000 Ω.

80 °C corresponds to a resistance from 275...375 Ω.

If specification is not attained:

Renew injection pump → Chapter.

If specification is attained:

Connect test box to wiring harness → Chapter.

Vehicles with a 7-pin injection pump connector

Check wiring between test box and connector (1) for open circuit referring to current flow diagram. Cable resistance: max. 1.5 Ω.

N23-0105
Connector contactTest box socket
763
433

Additionally check wires for short to one another, to vehicle earth and to battery positive. Specification: ∞ Ω.

Vehicles with a 10-pin injection pump connector

Check wiring between test box and connector (1) for open circuit referring to current flow diagram. Wire resistance: Max. 1.5 Ω.

N23-0225

Vehicles with a 68-pin control unit:

Connector contactTest box socket
763
433

Vehicles with a 121-pin control unit:

Connector contactTest box socket
7111
4103

Additionally check wires for short to one another, to vehicle earth and to battery positive. Specification: ∞ Ω.

Continuation for all vehicles

If no fault in lines is detected:

Renew diesel direct injection system control unit J248. Chapter

Parts & tools for this job For 1996 Volkswagen LT

As an Amazon Associate we earn from qualifying purchases.