Workshop Manuals Factory service & repair Alfa Romeo
01 General information02 Specifications03 Manufacturing data and tolerances04 Tightening torques05 Fluids and lubricants06 Maintenance07 Diagnostic checks08 Engine09 Clutch10 Gearbox and differential11 Axles and driveshafts12 Brakes13 Steering14 Suspension and wheels15 Heating, air conditioning and auxiliary units16 Electrical equipment17 Body fittings18 Body panels and frame19 Wiring diagrams and electrical functions20 Wiring harnesses21 Connectors and pin-outs22 Fault diagnosis23 Special tools
Alfa Romeo 147 Factory Service Manual (2000-2004)08 · Engine
08 · Engine

Timing variator solenoids - r + r

Make
Alfa Romeo
Model
147 Factory Service Manual
Year
2000–2004
Section
Petrol injection system › Timing variator solenoids - r + r
EngineTiming variator solenoids - r + r

Timing variator solenoids - r + r

Operation 1056B48 · Multi-point injection system (mpi)

1.6 TS · 120 CV

Removing

Ensure that the ignition key is in the OFF postition, then disconnect the battery negative terminal.

NameConnector
BatteryA1B

Proceed with the removal - 1016A40 ignition coil cover on cylinder head- r+r.

1. Disconnect the electrical connection from the variable valve timing electro-magnet.

NameConnector
1Timing variator actuatorN76

2. Undo the bolts (2a) and remove the variable valve timing electro-magnet (2b).

Timing variator solenoids - r + r

Refitting

Refit the variable valve timing electro-magnet and secure by tightening the bolts to the recommended torque.

FasteningComponentØ

Value

(daNm)

BoltADVANCE VARIATOR SOLENOIDSM7(Intake manifold side) 1.4 ÷ 1.7

Connect the electrical connection to the variable valve timing electro-magnet.

Proceed with the refitting - 1016A40 ignition coil cover on cylinder head- r+r.

Connect the battery terminal (-).

2.0 TS

Removing

Ensure that the ignition key is in the OFF postition, then disconnect the battery negative terminal.

NameConnector
BatteryA1B

Proceed with the removal - 1016A40 ignition coil cover on cylinder head- r+r.

1. Disconnect the electrical connection from the variable valve timing electro-magnet.

NameConnector
1Timing variator actuatorN76

2. Undo the bolts (2a) and remove the variable valve timing electro-magnet (2b).

Timing variator solenoids - r + r

Refitting

Refit the variable valve timing electro-magnet and secure by tightening the bolts to the recommended torque.

FasteningComponentØ

Value

(daNm)

BoltADVANCE VARIATOR SOLENOIDSM7(Intake manifold side) 1.4 ÷ 1.7

Connect the electrical connection to the variable valve timing electro-magnet.

Proceed with the refitting - 1016A40 ignition coil cover on cylinder head- r+r.

Connect the battery terminal (-).

Parts & tools for this job For 2000 Alfa Romeo 147

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.