Removing / refitting (page 2 of 4)
- Make
- Alfa Romeo
- Model
- GTV / Spider GTV and Spider (916) Factory Service Manual
- Year
- 1995–2000
- Section
- Gearbox unit
21 GearboxRemoving / refitting · page 2 of 4
- Slacken the two upper screws fastening the gear-box to the engine.
75 ÷ 92 Nm
7.6 ÷ 9.4 Kgm
- Position engine support 1.820.226.000, with supports 1. 820.239.000 and cross rail 1.820.581.000.
- Place a support square on the front of the crank-case.
- Place a support square on the rear of the crank-case, between two injectors.
- Set a chain between the two squares and the support, hooking the engine to the support.
CAUTION: To avoid damaging the power steering piping housed at the front of the radiator, interpose a suitable thickness between the front connection of the tool and its resting surface.
- Raise the car.
- Slacken the plug and drain the gearbox-differential oil recovering it in a suitable recipient.
- Disconnect the earth braid from the gearbox.
Parts & tools for this job For 1995 Alfa Romeo GTV / Spider
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Alfa Romeo GTV / Spider
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.