Workshop Manuals Factory service & repair Audi
01 Servicing 6-cylinder TDI engine, common rail (EA 897 Gen. I)02 6-cylinder TDI engine, 3.0 ltr. 4-valve common rail (EA 897 Gen. I)03 Fuel supply system, diesel engines04 6-cylinder direct injection engine with supercharger (3.0 ltr. 4-valve TFSI)05 Fuel supply system, petrol engines06 4-cylinder direct injection engine (1.8, 2.0 ltr. 4-valve TFSI - generation III)07 Technical data for engines08 Rear final drive 0D2, 0D3, 0DB09 8-speed automatic gearbox 0D510 8-speed automatic gearbox 0D711 Running gear: Specifications for testing the braking force (according to German legislation)12 Running gear: Trailer Operation Guide13 Running gear: Wheel/Tyre Guide14 Running gear, front-wheel drive and four-wheel drive15 Brake system16 Heating, air conditioning17 Heating and air conditioning: Auxiliary/supplementary heater18 Electrical: Communication19 Electrical system20 Electrical: Basic information on high-voltage vehicles21 General body repairs, interior22 General body repairs, exterior
Audi Q7 Mk2 (2015-2023)07 · Technical data for engines
07 · Engine

Procedure

Make
Audi
Model
Q7 Mk2
Year
2015–2023
Section
Overview of engines › Procedure
Technical data for enginesProcedure

Procedure

Cutting locations

Roof (normal version) already removedRoof already removed (vehicle with panoramic sunroof)

Cut out roof cross member using body saw.

Separate original joint using rechargeable riveter VAS 843 001 or compact booster VAS 6790/20 with attachmentChapter.

A51-11960

Remove remaining material using compact angle grinder.

A51-11961

Replacement parts

  • Rear roof cross member
  • Solid aluminium rivet 4 x 8 mm
  • Solid aluminium rivet 6 x 10 mm
  • 2-component epoxy adhesive DA 001 730 A2
  • Cleaning solution D.009.401.04
  • Silicate stone DA.009.800
  • Aluminium primer DA.009.801
  • Punch rivet
  • Applicator D.009.500.25

Clean bonding surfaces with cleaning solution D.009.401.04.

Treat flanges with silicate stone DA.009.800 and holder V.A.G 1931.

Apply a thin coat of aluminium primer DA.009.801 using applicator D.009.500.25 and allow to flash off.

A silicate adhesive layer is formed which ensures long-term durability of the bonded joint. The surface becomes matt.

Apply 2-component epoxy adhesive DA 001 730 A2 to riveting area using pneumatic glue gun V.A.G 2005 B.

A51-11962

Installing

Match up and fix new part in position.

Punch holes for 4 mm solid aluminium rivet (3) and 6 mm solid aluminium rivet (2) in positions of punch rivets using rechargeable riveter VAS 843 001 or compact booster VAS 6790.

Rivet in roof cross member (1) using rechargeable riveter VAS 843 001 or compact booster VAS 6790/20 with attachmentChapter.

A51-11963

Parts & tools for this job For 2015 Audi Q7

As an Amazon Associate we earn from qualifying purchases.