Procedure
- Make
- Audi
- Model
- Q7 Mk2
- Year
- 2015–2023
- Section
- Overview of engines › Procedure
Procedure
Make separating cut for longitudinal member using body saw (it is essential to keep to dimension (1)).
Loosen bolted connections for support for wing mounting flange.

Remove remaining material using compact angle grinder.

- Replacement part with welded aluminium adapters 4M0.805.109.D /110.D
- 10x pop rivet nut N.908.568.02
- 10x bolt M8 x 25 N.019.530.8
Position replacement part in longitudinal member and drill 7 mm ∅ holes.

Remove replacement part again and drill 11 mm ∅ holes for pop rivet nuts, lower it and set pop rivet nuts using pop rivet nut pliers V.A.G 1765 C.

Drill 9 mm ∅ holes for bolted connection in longitudinal member.

Roughen bonding surface using a clean sanding disc (grit size P 80 or P 100).
Clean new part with cleaning solution D.009.401.04.
Apply 2-component epoxy adhesive DA 180 A00 A2 to entire riveting area and wheel housing using double cartridge gun VAS 6453.

Warning Pre-treatment applies to old flange only.
Use clean brush to remove sanding dust.
Clean bonding surfaces with cleaning solution D.009.401.04.
Treat flanges with silicate stone DA.009.800 and holder V.A.G 1931.
Apply a thin coat of aluminium primer DA.009.801 using applicator D.009.500.25 and allow to flash off.
Apply 2-component epoxy adhesive DA 180 A00 A2 to entire riveting area and wheel housing using double cartridge gun VAS 6453.
Secure new part with bolts (tightening torque 24 Nm).

Parts & tools for this job For 2015 Audi Q7
- PARTEngine gasket setSearch: Audi Q7 2015 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.