Workshop Manuals Factory service & repair Audi
01 Servicing 6-cylinder TDI engine, common rail (EA 897 Gen. I)02 6-cylinder TDI engine, 3.0 ltr. 4-valve common rail (EA 897 Gen. I)03 Fuel supply system, diesel engines04 6-cylinder direct injection engine with supercharger (3.0 ltr. 4-valve TFSI)05 Fuel supply system, petrol engines06 4-cylinder direct injection engine (1.8, 2.0 ltr. 4-valve TFSI - generation III)07 Technical data for engines08 Rear final drive 0D2, 0D3, 0DB09 8-speed automatic gearbox 0D510 8-speed automatic gearbox 0D711 Running gear: Specifications for testing the braking force (according to German legislation)12 Running gear: Trailer Operation Guide13 Running gear: Wheel/Tyre Guide14 Running gear, front-wheel drive and four-wheel drive15 Brake system16 Heating, air conditioning17 Heating and air conditioning: Auxiliary/supplementary heater18 Electrical: Communication19 Electrical system20 Electrical: Basic information on high-voltage vehicles21 General body repairs, interior22 General body repairs, exterior
Audi Q7 Mk2 (2015-2023)07 · Technical data for engines
07 · Engine

Procedure

Make
Audi
Model
Q7 Mk2
Year
2015–2023
Section
Overview of engines › Procedure
Technical data for enginesProcedure

Procedure

Cutting locations

Remove flow-drill screws (3) using socket for flow-drill screws VAS 852 007.

Make separating cuts as shown using body saw.

Separate original joint using rechargeable riveter VAS 843 001 or compact booster VAS 6790/20 with attachmentChapter.

Separate original joint using spot weld breaker.

Separate original bonded joint (1) from closure plate (2).

A50-11031

Remove flow-drill screws (1) using socket for flow-drill screws VAS 852 007.

Separate original joint using spot weld breaker.

A50-11034

Remove remaining material using compact angle grinder.

A50-11036

Replacement part

  • Suspension turret
  • Pop rivets
  • 2-component epoxy adhesive DA 180 A00 A2, 400 ml
  • Cleaning solution D.009.401.04
  • Silicate stone DA.009.800
  • Aluminium primer DA.009.801
  • Applicator D.009.500.25

Preparing new part

Separate original joint using rechargeable riveter VAS 843 001 or compact booster VAS 6790/20 with attachmentChapter.

Detach plenum chamber panel (1).

Remove remaining material using compact angle grinder.

A50-11033

Installing

Clean bonding surfaces with cleaning solution D.009.401.04.

Treat flanges with silicate stone DA.009.800 and holder V.A.G 1931.

Apply a thin coat of aluminium primer DA.009.801 using applicator D.009.500.25 and allow to flash off.

A silicate adhesive layer is formed which ensures long-term durability of the bonded joint. The surface becomes matt.

Apply 2-component epoxy adhesive to riveting area using double cartridge gun VAS 6453.

A50-11032

Match up new part with vehicle positioned on alignment bracket set and fix in place.

Screw in flow-drill screws (1) using socket for flow-drill screws VAS 852 007.

Weld in new part: RP spot weld seam.

Punch holes for 6.5 mm pop rivets in positions of punch rivets using rechargeable riveter VAS 843 001 or compact booster VAS 6790.

Rivet in new part with 6.5 mm pop rivets using rechargeable riveter VAS 843 001 or compact booster VAS 6790/20.

A50-11037

Screw in flow-drill screws (1) using socket for flow-drill screws VAS 852 007.

Drill 7.0 mm ∅ holes for 6.5 mm pop rivets in positions of punch rivets using drill.

Rivet in new part with 6.5 mm pop rivets using rechargeable riveter VAS 843 001 or compact booster VAS 6790/20.

Weld in new part: RP spot weld seam.

A50-11035

Allocation of pop rivets

Replacement partPanel thickness that can be riveted
Pop rivet N 911 033 012 - 4 mm
Pop rivet WHT 005 6973 - 4.8 mm
Pop rivet N 106 414 015 - 9 mm

Parts & tools for this job For 2015 Audi Q7

As an Amazon Associate we earn from qualifying purchases.