Procedure
- Make
- Audi
- Model
- Q7 Mk2
- Year
- 2015–2023
- Section
- Overview of engines › Procedure
Procedure
Drill out original joint using spot weld breaker.

Separate original joint using rechargeable riveter VAS 5279A or compact booster VAS 6790.
Mark out and make separating cuts using body saw.
Grind through flanged seam using compact angle grinder.

Transfer separating cuts to new part and cut to size using body saw.

Side member (sub-part)
2-component epoxy adhesive DA 001 730 A2
Cleaning solution D.009.401.04
Punch rivet N 912 295 02
Silicate stone DA.009.800
Aluminium primer DA.009.801
Applicator D.009.500.25
Warning Pre-treatment applies to old flange only.
Use clean brush to remove sanding dust.
Clean bonding surfaces with cleaning solution D 009 401 04.
Treat flanges with silicate stone DA.009.800 and holder V.A.G 1931.
Apply a thin coat of aluminium primer DA.009.801 using applicator D.009.500.25 and allow to flash off.
Prepare flanges on body and new parts for welding.
Apply 2-component epoxy adhesive DA 180 A00 A2 to entire riveting area using double cartridge gun VAS 6453.
Rivet in side member using rechargeable riveter VAS 843 001 or compact booster VAS 6790 and attachment for punch rivet N 912 295 02Chapter.
Weld in at separating cuts using shielded arc welding equipment: SG continuous seam.

Fold over side member flange (A). Wipe off emerging adhesive and seal joint.
Weld in side member using resistance spot welder: RP spot weld seam.

Parts & tools for this job For 2015 Audi Q7
- PARTEngine gasket setSearch: Audi Q7 2015 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.