Workshop Manuals Factory service & repair Audi
01 Servicing 6-cylinder TDI engine, common rail (EA 897 Gen. I)02 6-cylinder TDI engine, 3.0 ltr. 4-valve common rail (EA 897 Gen. I)03 Fuel supply system, diesel engines04 6-cylinder direct injection engine with supercharger (3.0 ltr. 4-valve TFSI)05 Fuel supply system, petrol engines06 4-cylinder direct injection engine (1.8, 2.0 ltr. 4-valve TFSI - generation III)07 Technical data for engines08 Rear final drive 0D2, 0D3, 0DB09 8-speed automatic gearbox 0D510 8-speed automatic gearbox 0D711 Running gear: Specifications for testing the braking force (according to German legislation)12 Running gear: Trailer Operation Guide13 Running gear: Wheel/Tyre Guide14 Running gear, front-wheel drive and four-wheel drive15 Brake system16 Heating, air conditioning17 Heating and air conditioning: Auxiliary/supplementary heater18 Electrical: Communication19 Electrical system20 Electrical: Basic information on high-voltage vehicles21 General body repairs, interior22 General body repairs, exterior
Audi Q7 Mk2 (2015-2023)07 · Technical data for engines
07 · Engine

Procedure

Make
Audi
Model
Q7 Mk2
Year
2015–2023
Section
Overview of engines › Procedure
Technical data for enginesProcedure

Procedure

Cutting locations

Side panel already removed ChapterC-pillar reinforcement already removed → Chapter

Make separating cut in side member as shown using body saw.

Separate original joint using rechargeable riveter VAS 843 001 or compact booster VAS 6790/20 with attachmentChapter.

A53-11204

Remove remaining material using compact angle grinder.

A53-11216

Replacement part

  • Wheel housing
  • Solid aluminium rivet 6 x 12 mm
  • Pop rivets
  • 2-component epoxy adhesive DA 001 730 A2
  • Cleaning solution D.009.401.04
  • Silicate stone D.009.800
  • Aluminium primer DA.009.801
  • Applicator D.009.500.25

Preparing new part

Transfer separating cut to new part.

Cut new part to size using body saw.

A53-11215

Installing

Clean bonding surfaces with cleaning solution D.009.401.04.

Treat flanges with silicate stone D.009.800 and holder V.A.G 1931.

Apply a thin coat of aluminium primer DA.009.801 using applicator D.009.500.25 and allow to flash off.

A silicate adhesive layer is formed which ensures long-term durability of the bonded joint. The surface becomes matt.

Apply 2-component epoxy adhesive to entire riveting area using pneumatic glue gun V.A.G 2005 B.

A53-11217

Position of rivets

A53-11213
  • Solid aluminium rivet 6 x 12 mm
  • Pop rivets 6,5 mm

Place weld pool backing plate of same material behind separating cuts.

Match up and fix new part in position.

Check fit relative to adjacent parts.

Drill 7.0 mm ∅ holes for 6.5 mm pop rivets in positions of punch rivets using drill.

Punch holes for 6 mm solid aluminium rivet in positions of punch rivets using rechargeable riveter VAS 843 001 or compact booster VAS 6790.

Rivet in new part with 6.5 mm pop rivets using rechargeable riveter VAS 843 001 or compact booster VAS 6790/20.

Rivet in new part with 6 x 12 mm solid aluminium rivet using rechargeable riveter VAS 843 001 or compact booster VAS 6790/20 with attachmentChapter.

Weld separating cut: SG continuous seam.

A53-11214

Install C-pillar reinforcement → Chapter.

Install side panel → Chapter.

Allocation of pop rivets

Replacement partPanel thickness that can be riveted
Pop rivet N.911.033.012 - 4 mm
Pop rivet WHT.005.6973 - 4.8 mm
Pop rivet N.106.414.015 - 9 mm

Parts & tools for this job For 2015 Audi Q7

As an Amazon Associate we earn from qualifying purchases.