Tightening procedure: GNV supply unions
- Make
- Citroën
- Model
- Berlingo Factory Workshop Manual
- Year
- 1996–2002
- Section
- Air and fuel supply › Tightening procedure: GNV supply unions
Tightening procedure: GNV supply unions
1. General
ESSENTIAL: Visually check all the supply unions and pipes. Replace any components about which you have doubts.
This procedure applies solely to SWAGELOK unions.
SWAGELOK unions can be removed and refitted more than once and tightened to retain the same sealing.
2. Tightening procedure
CAUTION: The tightening method differs between a new union and one that is being re-used.
2.1. New unions and piping
Pipe with pre-crimped seal ring and union type connectors.
Position the conical ring (2) on the new pipe (detail A).
Insert the conical ring (2) into the connector (3) (detail B).
Do up the nut (1) by hand.
Check during the operation to crimp the tapered seal (2), that the pipe stays fully lodged in the connector (3).
Tighten the nut (1) a turn and a quarter (450°) (detail C).
2.2. Unions and piping being re-used
Position the conical ring (2) on the new pipe (detail A).
Insert the conical ring (2) into the connector (3) (detail B).
Do up the nut (1) by hand.
Check during the operation to crimp the tapered seal (2), that the pipe stays fully lodged in the connector (3).
Tighten the nut (1) a quarter turn (90°).
3. Additional operations
Check there are no leaks on the union (3) (see the relevant operation).
Parts & tools for this job For 1996 Citroën Berlingo
- PARTEngine gasket setSearch: Citroën Berlingo 1996 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.