Workshop Manuals Factory service & repair Land Rover
01 Borg Warner Transfer Gerabox Overhaul Manual02 INTRODUCTION03 DESCRIPTION AND OPERATION04 05 06 07 08 09 10 OVERHAUL11 SPECIFICATIONS, TORQUE
Land Rover Borg Warner Transfer Box10 · OVERHAUL
10 · General

FRONT OUTPUT SHAFT DRIVE FLANGE

Make
Land Rover
Model
Gearboxes Borg Warner Transfer Box
Section
FRONT OUTPUT SHAFT DRIVE FLANGE
OVERHAULFRONT OUTPUT SHAFT DRIVE FLANGE
FRONT OUTPUT SHAFT DRIVE FLANGE – Land Rover Borg Warner Transfer Box

TRANSFER BOX

2

OVERHAUL

FRONT OUTPUT SHAFT DRIVE FLANGE

Service repair no - 41.20.15/01

Remove

1. Using LRT-51-003 to restrain front output shaft

drive flange, remove and discard nut securing
drive flange to front output shaft.

2. Collect washer and seal.

3. Using LRT-99-500 if necessary, remove drive

flange from front output shaft.

Refit

1. Clean running surface of drive flange. Ensure

all traces of rubber are removed.

CAUTION: Do not use a metal scraper as
this may damage sealing surface.

2. Fit drive flange to front output shaft.
3. Fit seal, washer and new nut to front output

shaft.

4. Using LRT-51-003 to restrain drive flange,

tighten nut to 220 Nm. (162 lbf.ft)

Parts & tools for this job For Land Rover Gearboxes

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.