Removing, testing
- Make
- SEAT
- Model
- Toledo
- Year
- 1M, 1999–2004
- Section
- Heating, ventilation and air conditioning › Removing, testing
Removing, testing
Remove glove box and centre console. Bodywork - Interior fitting work Rep. gr. 68
Fold the floor covering back in the area of the condensation drainage tube until the tube can be seen. Bodywork - Interior fitting work Rep. gr. 68

Check the correct positioning of the condensation drainage tube (B) (eliminate any folding for example) and ensure that it is clean.
Cover the area under the passage (D) (for the drainage of the condensation water (C)) using absorbent paper (so that water does not go under the carpet).
Remove the condensation water drain (B).
Check if the condensation water drainage tube of the air conditioning (A) is clean, for example use a piece of wire.
Check the distance between noise insulation mat attached to the middle tunnel and the condensed water drainage valve (C) on the opening in the floor plate (D). An adequate size of the clearance must be provided so that the condensed water can flow out of the water drainage (C) valve.

- Installing
Install in reverse order, observing following:
Fit the condensation drainage (B) so that it is not bent or trapped.
Ensure during fitting of the floor mat that the condensation drainage tube is not crushed (B).
Parts & tools for this job For 1999 SEAT Toledo
- TOOLA/C manifold gauge setSearch: AC manifold gauge set
- TOOLUV leak detection kitSearch: AC UV leak detection kit
- PARTCabin filterSearch: SEAT Toledo 1999 cabin filter
As an Amazon Associate we earn from qualifying purchases.