Workshop Manuals Factory service & repair Toyota
01 Relays and Modules02 Sensors and Switches03 Maintenance04 Engine, Cooling and Exhaust05 Hybrid Drive Systems06 Powertrain Management07 Transmission and Drivetrain08 Brakes and Traction Control09 Starting and Charging10 Power and Ground Distribution11 Steering and Suspension12 Heating and Air Conditioning13 Restraint Systems14 Accessories and Optional Equipment15 Body and Frame16 Cruise Control17 Instrument Panel, Gauges and Warning Indicators18 Lighting and Horns19 Windows and Glass20 Wiper and Washer Systems
Toyota Supra L6-3.0L DOHC (7M-GE) (1990)03 · Maintenance
03 · Maintenance

Timing Belt: Specifications (page 6 of 12)

Make
Toyota
Model
Supra
Engine
L6-3.0L DOHC (7M-GE)
Year
1990
Section
Timing Belt
MaintenanceSpecifications · page 6 of 12
background image

(a) Loosen the idler pulley bolt and shift it left as far as it will go with a screwdriver and wrench.
(b) Temporarily tighten the set bolt and then relieve the timing belt tension.
(c) Remove the belt from the camshaft timing pulleys.

NOTE:

-

Support the belt so the meshing of the crankshaft timing pulley and timing belt does not shift. Be careful not to drop anything inside the timing
belt cover.

-

Do not allow the belt to come into contact with oil, water and dust.

10. REMOVE CAMSHAFT TIMING PULLEYS

Using SST to hold the pulley, remove the pulley bolt, timing pulley and match pin. SST 09278-54012

CAUTION:  Do not make use of the timing belt tension when removing and installing the pulley bolts.

11. REMOVE CRANKSHAFT PULLEY

(a) Using SST to hold the crankshaft pulley, loosen the pulley bolt. SST 09213-70010 and 09330-00021
(b) Remove SST and pulley bolt.

Pinch or Ctrl + scroll to zoom. Double-tap to reset.

Parts & tools for this job For 1990 Toyota Supra 3.0L

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.