Workshop Manuals Factory service & repair Fiat
01 General information02 Specifications03 Manufacturing data and tolerances04 Tightening torques05 Fluids and lubricants06 Maintenance07 Diagnostic checks08 Engine09 Clutch10 Gearbox and differential11 Axles and driveshafts12 Brakes13 Steering14 Suspension and wheels15 Heating, air conditioning and auxiliary units16 Electrical equipment17 Body fittings18 Body panels and frame19 Wiring diagrams and electrical functions20 Wiring harnesses21 Connectors and pin-outs22 Fault diagnosis23 Special tools
Fiat Bravo Factory Service Manual (2007-2014)08 · Engine
08 · Engine

Supercharging pressure solenoid (pierburg) valve operation check

Make
Fiat
Model
Bravo Factory Service Manual
Year
2007–2014
Section
Engine supercharging system › Supercharging pressure solenoid (pierburg) valve operation check
EngineSupercharging pressure solenoid (pierburg) valve operation check

SUPERCHARGING PRESSURE SOLENOID (PIERBURG) VALVE OPERATION CHECK

Check 1064BB

1.4 16v TJet

STEPCHECK TO BE PERFORMEDREMEDIAL ACTION IF THE CHECK IS NOT OK
1

Solenoid valve resistance check

Disconnect the wiring for the solenoid valve. Check that the resistance between the two terminals of the solenoid valve is 30 ohm ±10% at 20 °C (FIG.1).

Replace the turbopressure control solenoid valve

Op. 1064B38 WASTE GATE SUPERCHARGING PRESSURE ADJUSTMENT SOLENOID VALVE - R.R.

2

Solenoid valve ducts check

Connect to connector 3 of the supercharging pressure solenoid valve using the vacuum pump (FIG.1) n.° 2000015500

Operate the pump at a pressure below 0.50 bar (to prevent damaging the solenoid valve)

Check that nothing is preventing the flow of air between connectors 3 and 2

Replace the turbopressure control solenoid valve

Op. 1064B38 WASTE GATE SUPERCHARGING PRESSURE ADJUSTMENT SOLENOID VALVE - R.R.

3

Solenoid valve operation check

Connect to connector 1 of the supercharging pressure solenoid valve using the vacuum pump (FIG.1) n.° 2000015500

Operate the pump at a pressure below 0.50 bar (to prevent damaging the solenoid valve)

Check that nothing is preventing the flow of air between connectors 1 and 2

Connect the terminals of the solenoid valve to a 12 volt battery (using disconnector AD 233 N° 1806387000)

Operate the pump at a pressure below 0.50 bar (to prevent damaging the solenoid valve)

Check that nothing is preventing the flow of air between connectors 1 and 2 (internal passage closed)

Replace the turbopressure control solenoid valve

Op. 1064B38 WASTE GATE SUPERCHARGING PRESSURE ADJUSTMENT SOLENOID VALVE - R.R.

4

Pressure control solenoid valve signal check

Connect the Examiner in voltmeter mode: (using disconnector AD 233 N° 1806387000) insert the red probe in pin 2 of the solenoid valve and the black probe in pin 1

Set the Examiner basic time at 2 seconds and 20 V f.s.

Start the engine

Check for a square wave signal as illustrated in the graph

Restore the continuity of the wiring between the engine management control unit and the solenoid valve

If the signal is interrupted at the control unit output.

Replace the engine control unit

Op. 1056B82 INJECTION/IGNITION SYSTEM E.C.U. (ONE) - R + R

SUPERCHARGING PRESSURE SOLENOID (PIERBURG) VALVE OPERATION CHECK

FIG.1

SUPERCHARGING PRESSURE SOLENOID (PIERBURG) VALVE OPERATION CHECK

Supercharging pressure control solenoid valve pilot signal

Parts & tools for this job For 2007 Fiat Bravo

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.