Workshop Manuals Factory service & repair Fiat
01 00 Introduction and technical data02 10 Engine03 18 Clutch04 21 Gearbox and differential05 33 Braking system06 41 Steering07 44 Suspension and wheels08 50 Auxiliary units09 55 Electrical system10 70 Bodywork
Fiat Bravo/Brava (182) Factory Service Manual (1995-2001)09 · 55 Electrical system
09 · Electrical

Recharging

Make
Fiat
Model
Bravo /Brava (182) Factory Service Manual
Year
1995–2001
Section
Recharging › Recharging
55 Electrical systemRecharging · page 1 of 3

Recharging

Diagram showing the engine bay with a dipstick and oil filler cap (Fig. 1)
Diagram showing a rectangular cover on the engine secured by bolts, with arrows indicating removal direction (Fig. 2)

Removing-refitting (1998 20V version)

Position the vehicle on a lift and drain the climate control system (see section 50 - Auxiliary units).

Remove the right light cluster following the instructions given on page 19.

  1. Raise the vehicle and loosen the belt tensioner bearing, after having removed the lower protective shield (see page 45).
  2. Lower the vehicle and remove compressor protection shown in the diagram.
  3. Disconnect the electrical connection and the pipe for the climate control system shown.
  4. Disconnect the pipe for the climate control system from the compressor, working from the housing for the light cluster previously removed.
  5. Loosen the fixing bolt for the alternator mounting bracket.
Diagram showing the compressor area with an electrical connector being disconnected and arrows pointing to components (Fig. 3)

Parts & tools for this job For 1995 Fiat Bravo

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.