Workshop Manuals Factory service & repair Fiat
01 00 General information and technical data02 10 Engine03 18 Clutch04 21 Gearbox and differential05 27 Axle06 33 Braking system07 41 Steering08 44 Suspension and wheels09 50 Auxiliary units10 55 Electrical equipment11 70 Bodywork12 Diagnosis13 Tests14 Wiring diagrams
Fiat Seicento Factory Service Manual (1998-2010)02 · 10 Engine
02 · Engine

Installation

Make
Fiat
Model
Seicento Factory Service Manual
Year
1998–2010
Section
Timing system control (1108 Euro 3) › Installation
10 EngineInstallation
Diagram showing timing gear with callout numbers 1 and 2

1108 Euro 3

  1. Undo the bolts on the timing gear bottom cover.
  2. Remove the timing gear bottom cover.
Diagram showing timing gear bottom cover area with callout numbers 1 and 2

1108 Euro 3

  1. Check that the timing mark on the driving pulley (1a) is lined up with the reference on the engine block (1b).
Diagram showing timing belt and driving pulley with callout numbers 1a and 1b

1108 Euro 3

  1. Slacken the nut on the timing belt moving tensioner.
  2. Move the moving tensioner.
  3. Remove the timing belt.
Diagram showing timing belt tensioner assembly with callout numbers 1, 2 and 3

Installation

1108 Euro 3

  • Fit the timing belt on the pullies and moving tensioner.

The timing belt must be renewed whenever dismantled.

Parts & tools for this job For 1998 Fiat Seicento

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.