General description (page 8 of 8)
- Make
- Alfa Romeo
- Model
- 145/146 Factory Service Manual
- Year
- 1994–1999
- Section
- Removal/Refitting (1970 T. SPARK 16V)
EngineGeneral description · page 8 of 8
- Lower the hydraulic jack and remove the power unit from the engine compartment.
WARNING: The hydraulic jack must have a capacity of at least 1000 kg.
- Support the power unit with a hydraulic hoist besides the hydraulic jack used for removal.
WARNING: For moving the power unit, use a hydraulic hoist after freeing it from the hydraulic jack.
- Release the power unit from the support tools then position it on a suitable workbench.
- Slacken the fastening screws and remove the starter motor.
- Slacken the fastening screws and nuts and remove the gearbox and differential unit.
- Remove the two heat exchanger coolant delivery and return pipes.
- Slacken the three fastening screws and remove the lay shaft.
- Remove the dust guard ring.
- Remove the lower flywheel cover.
- Slacken the fastening screws and remove the pressure plate body and clutch plate.
- Slacken the fastening screw and remove the auxiliary components drive belt guide pulley.
Parts & tools for this job For 1994 Alfa Romeo 145/146
- PARTEngine gasket setSearch: Alfa Romeo 145/146 1994 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.