Removal/Refitting (1910 JTD) (page 4 of 8)
- Make
- Alfa Romeo
- Model
- 145/146 Factory Service Manual
- Year
- 1994–1999
- Section
- Removal/Refitting (1910 JTD)
GearboxRemoval/Refitting (1910 JTD) · page 4 of 8
- Install cross rail no. 1.820.581.000 complete with rest pads no. 1.820.239.000.
- Install support no. 1.820.226.000 and connect the corresponding tie-rods to the brackets installed previously.
- Slacken the bolts fastening the left axle shaft to the differential inner shaft.
- Slacken the fastenings and remove the power steering pipe support bracket.
40 ÷ 52 Nm
4.1 ÷ 5.3 kgm
- Slacken the fastening nuts and remove the reinforcement bracket.
- Slacken the nuts and screws and remove the front section of the exhaust pipe.
- Remove the associated pipes.
- Slacken the drain cap and drain the gearbox/differential oil.
NOTE: Collect the gearbox/differential oil in a suitable container.
16 ÷ 26 Nm
1.6 ÷ 2.7 kgm
- Slacken the nuts and remove the power steering box heat shield.
Parts & tools for this job For 1994 Alfa Romeo 145/146
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Alfa Romeo 145/146
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.