Removal/Refitting (1910 JTD) (page 6 of 8)
- Make
- Alfa Romeo
- Model
- 145/146 Factory Service Manual
- Year
- 1994–1999
- Section
- Removal/Refitting (1910 JTD)
GearboxRemoval/Refitting (1910 JTD) · page 6 of 8
- Slacken the screws fastening the power steering box to the front suspension cross rail.
- Slacken the screws fastening sound-absorbing protections to the front suspension cross rail.
2. Slacken the side and rear screws fastening the front suspension cross rail to the body.
- Lower the hydraulic jack and remove the front suspension cross rail complete with stabiliser bar and wishbones.
- Slacken the nut and disconnect the gearbox earth cable.
- Set a hydraulic jack under the gearbox.
- Support the gearbox with a hydraulic jack fitted with tools no. 1.870.644.000 and no. 1.870.644.001.
- Slacken the screws and remove the gearbox stiff side support.
Parts & tools for this job For 1994 Alfa Romeo 145/146
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Alfa Romeo 145/146
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.