Workshop Manuals Factory service & repair Alfa Romeo
01 Introduction and contents02 Technical data and maintenance03 Engine04 Clutch05 Gearbox06 Front axle and drive shafts07 Brakes08 Steering09 Suspension and wheels10 Heating and ventilation11 Bodywork12 Timing belt data sheets
Alfa Romeo 145/146 Factory Service Manual (1994-1999)05 · Gearbox
05 · Transmission

Removal/Refitting (1910 JTD) (page 5 of 8)

Make
Alfa Romeo
Model
145/146 Factory Service Manual
Year
1994–1999
Section
Removal/Refitting (1910 JTD)
GearboxRemoval/Refitting (1910 JTD) · page 5 of 8
  1. Set a hydraulic jack under the gearbox.
  2. Slacken the fastening screws and remove the power unit rear rigid support.
Gearbox with hydraulic jack and screws labeled 1 and 2
  1. Slacken the lower screw fastening the starter motor, then move it aside.
  2. Slacken the fastening screws and move the right differential flange complete with thrust ring.
  3. Slacken the fastening screws and remove the lower flywheel guard.
Starter motor, differential flange, and flywheel guard with torque values

23 ÷ 28 Nm
2.3 ÷ 2.9 kgm

21 ÷ 26 Nm
2.1 ÷ 2.7 kgm

  1. Slacken the nuts fastening the support for the gearshift and handbrake control levers and retrieve the corresponding plates.
Wishbone bolts with torque value

67 ÷ 74 Nm
6.8 ÷ 7.5 kgm

  1. Slacken the front screws (2a) and slacken the rear screws (2b) fastening the support for the gearshift and handbrake control levers.
  2. Lower the front of the support for the gearshift and handbrake control levers.
  3. Support the front suspension cross rail with a hydraulic jack fitted with tool no. 1.860.978.000.
Support for gearshift and handbrake control levers with screws 2a and 2b, and tool 1.860.978.000

Parts & tools for this job For 1994 Alfa Romeo 145/146

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.