Attaching
- Make
- Audi
- Model
- A8 D3
- Year
- 2002–2010
- Section
- Servicing refrigerant circuit › Attaching
Attaching
Install in reverse order, paying attention to the following:
Replace the O-rings (A) and (B), version Electronic parts catalogue

Note
- Moisten the O-rings slightly with refrigerant oil before fitting → Chapter.
Take care not to strain the refrigerant lines on installation.
After attaching the refrigerant lines and installing the brake master cylinder, check proper installation of the pipe penetration (A).

Check the position of the refrigerant lines to the evaporator. They must not make contact with other components.
Re-install the other components removed.
Evacuate and refill the refrigerant circuit. Air conditioner with refrigerant R134a
Start up the air conditioner after charging the refrigerant circuit → Chapter.
Note
- Also heed the notes on start-up of the air conditioner after charging Air conditioner with refrigerant R134a.
Parts & tools for this job For 2002 Audi A8
- TOOLA/C manifold gauge setSearch: AC manifold gauge set
- TOOLUV leak detection kitSearch: AC UV leak detection kit
- PARTCabin filterSearch: Audi A8 2002 cabin filter
As an Amazon Associate we earn from qualifying purchases.