Workshop Manuals Factory service & repair Fiat
01 00 Introduction and technical data02 10 Engine03 18 Clutch04 21 Gearbox and differential05 33 Braking system06 41 Steering07 44 Suspension and wheels08 50 Auxiliary units09 55 Electrical system10 70 Bodywork
Fiat Bravo/Brava (182) Factory Service Manual (1995-2001)02 · 10 Engine
02 · Engine

Removing - refitting (page 8 of 8)

Make
Fiat
Model
Bravo /Brava (182) Factory Service Manual
Year
1995–2001
Section
Removing-refitting (1910 TD 100)
10 EngineRemoving - refitting · page 8 of 8
Diagram showing the central power unit mount and retaining bolts
Diagram showing the timing end engine mount and central bolt

P4A11FX01

P4A11FX02

Diagram showing the gearbox end engine mount and retaining bolts with arrows indicating removal direction
  1. Remove the central power unit mount by unscrewing the bolts retaining it to the body.
  2. Remove the timing end engine mount by unscrewing the central bolt.
  3. Disconnect the gearbox end engine mount by unscrewing the retaining bolts shown.
  4. Lower the hydraulic jack and remove the power unit from below the vehicle.

Lower the hydraulic jack gradually and check that the power unit is correctly positioned and balanced on the mounting tool.

Diagram showing the power unit lowered on a hydraulic hoist stand below the vehicle chassis
  • Position the power unit on a stand using a hydraulic hoist.

Use a hydraulic hoist to move the power unit, once it has been released from the mounting tool.

NOTE To refit the power unit, carry out removal operations in reverse order.

- Prepare the engine bay to fit the power unit. Take care to arrange all electrical leads, pipes etc. so that they do not get in the way when the engine is refitted;

P4A11FX03

P4A11FX04

Parts & tools for this job For 1995 Fiat Bravo

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.