Workshop Manuals Factory service & repair Fiat
01 00 General information and technical data02 10 Engine03 18 Clutch04 21 Gearbox and differential05 27 Axle06 33 Braking system07 41 Steering08 44 Suspension and wheels09 50 Auxiliary units10 55 Electrical equipment11 70 Bodywork12 Diagnosis13 Tests14 Wiring diagrams
Fiat Seicento Factory Service Manual (1998-2010)02 · 10 Engine
02 · Engine

1. Assemble the flywheel stop fixture

Make
Fiat
Model
Seicento Factory Service Manual
Year
1998–2010
Section
Timing system control (1108) › 1. Assemble the flywheel stop fixture
10 Engine1. Assemble the flywheel stop fixture

(Cont.Op.1032B44)

  1. Remove the gearbox case guard.
Diagram showing the gearbox case guard with callout numbers 1, 2, and 3 indicating bolts and the guard itself.

1. Assemble the flywheel stop fixture

NameCode
1Countertorque1.860.846.000
Diagram showing the flywheel stop fixture installed on the engine with callout number 1.
  1. Unscrew the toothed pulley screw.
  2. Remove the toothed drive pulley.
Diagram showing the toothed drive pulley and its screw with callout numbers 1 and 2.

Refitting

  • Mount the toothed drive pulley.
  • Tighten the toothed pulley screw to correct torque
FasteningComponentØValue (daNm)
-ScrewTOOTHED DRIVE PULLEYM108.0
  • Remove the flywheel stop fixture
NameCode
-Countertorque1.860.846.000
  • Mount the gear case guard.
  • Tighten the gear case guard screws to correct torque
FasteningComponentØValue (daNm)
-ScrewGEAR CASE GUARDM60.5

Parts & tools for this job For 1998 Fiat Seicento

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.