Workshop Manuals Factory service & repair Fiat
01 00 General information and technical data02 10 Engine03 18 Clutch04 21 Gearbox and differential05 27 Axle06 33 Braking system07 41 Steering08 44 Suspension and wheels09 50 Auxiliary units10 55 Electrical equipment11 70 Bodywork12 Diagnosis13 Tests14 Wiring diagrams
Fiat Seicento Factory Service Manual (1998-2010)02 · 10 Engine
02 · Engine

Operations

Make
Fiat
Model
Seicento Factory Service Manual
Year
1998–2010
Section
Timing system control (1108) › Operations
10 EngineOperations · page 1 of 2

OPERATIONS

1032B14 - TOOTHED TIMING BELT - R+R. FOR TIMING ADJUSTMENT OR REPLACEMENT IN VERSIONS WITH AIR CONDITIONER

Removal

  • Position the vehicle on a hoist.
  • Fit the car body right protection cover.
  • Disconnect the negative (-) battery terminal.
NameConnector
- BatteryA1
  • Follow Op. 4450B10 Front WHEEL (one) - R.R.
  • Follow Op. 7055B42 SUPPLEMENTARY WHEEL HOUSING (One) - R.R.
  • Follow Op. 5540B10 HEADLAMP (one), lh or rh - R+R.
  1. Unscrew the engine coolant supply tank screws.
  2. Move the engine coolant tank without detaching the pipes.
Diagram of the engine coolant supply tank with numbered callouts 1 and 2
  1. Take out the wiring from the timing system upper guard.
  2. Unscrew the timing system upper guard screws.
  3. Remove the timing system upper guard.
Diagram showing the timing system upper guard area with numbered callouts 1, 2, and 3
  1. Rotate the crankshaft until the phase notches on the toothed driven pulley and the cylinder head coincide.
Diagram of the toothed driven pulley and cylinder head showing alignment of phase notches with callout 1

(Cont.)

Parts & tools for this job For 1998 Fiat Seicento

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.