landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

HEATER CONTROL CABLE - AIR DISTRIBUTION > < HEATER CONTROL CABLE - TEMPERATURE CONTROL
Page 363
background image

HEATING AND VENTILATION

5

REPAIR

16. Secure control cables to engine bulkhead and

heater hoses with retaining clips.

17. With control lever in closed position, fit inner

cable to lever clevis and fully tighten clevis grub
screw.

18. Fit outer cable retaining clip and fully tighten

securing bolt.

19. Fit side cover to control lever assembly. Ensure

fixing screw spacers are positioned between
cover and lever assembly.

20. Fit side cover to fascia.
21. Fit control lever knobs.
22. Reconnect speedometer cable and fit instrument

panel.

23. Reconnect battery.

HEATER CONTROL CABLE - AIR DISTRIBUTION > < HEATER CONTROL CABLE - TEMPERATURE CONTROL