Top Cover Assembly - Nissan 240SX 1991-1992 Workshop Manual
- Make
- Nissan and Datsun
- Model
- 240SX Nissan 240SX 1991-92 Workshop Manual
- Section
- General › Top Cover Assembly - Nissan 240SX 1991-1992 Workshop Manual
‹ Prev Top Cover Assembly - Nissan 240SX 1991-1992 Workshop ManualNext › Top Cover Assembly - Nissan 240SX 1991-1992 Workshop Manual
Top Cover AssemblyTop Cover Assembly - Nissan 240SX 1991-1992 Workshop Manual
Top Cover Assembly
TOP COVER ASSEMBLY
11-4 TOP COVER ASSEMBLY (cont'd) Remove six (6) screws and front retainer from No. 1 bow. (b) Remove front rail weatherstrip retainers (see 3-13) (c)
(d) Carefully break cement bond by pulling top cover material
away from No. 1 bow.
REMOVE RIGHT AND LEFT RETENTION CABLE SCREWS.
5.
REMOVE TOP COVER FROM NO. 2 AND NO. 3 BOWS.
6. Remove three (3) screws from underside of No. 2 bow. (a)
Hold top cover away from No. 2 bow and slide retainer from
(b) top cover pocket. Repeat (a) and (b) for No. 3 bow. (c)
REMOVE TOP COVER FROM RIGHT AND LEFT SEAL
7. CARRIERS.
Carefully break cement bond by pulling top cover material from
seal carrier groove.
‹ Prev Top Cover Assembly - Nissan 240SX 1991-1992 Workshop ManualNext › Top Cover Assembly - Nissan 240SX 1991-1992 Workshop Manual
Parts & tools for this job For Nissan 240SX
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Nissan 240SX
As an Amazon Associate we earn from qualifying purchases.