Workshop Manuals Factory service & repair Fiat
01 00 General information and technical data02 10 Engine03 18 Clutch04 21 Gearbox and differential05 27 Axle06 33 Braking system07 41 Steering08 44 Suspension and wheels09 50 Auxiliary units10 55 Electrical equipment11 70 Bodywork12 Diagnosis13 Tests14 Wiring diagrams
Fiat Seicento Factory Service Manual (1998-2010)09 · 50 Auxiliary units
09 · General

Refitting

Make
Fiat
Model
Seicento Factory Service Manual
Year
1998–2010
Section
Heater › Refitting
50 Auxiliary unitsRefitting
  1. Unscrew the fastening screws and remove the fan air conveyer group with the air intake/recirculation flaps.
Exploded view of the fan air conveyer group showing the wiring bundle and half-shell assembly
  • Remove the heater wiring bundle.
  1. Unscrew the fastening screws and remove the air conveyer half-shell.
Close-up exploded view of the air intake/recirculation flap control mechanism and toothed sectors
  1. Remove the air intake/recirculation flaps control.
  2. Raise the stop tab and take out the air intake/recirculation flaps control lever.
  3. Raise the stop tab and take out the air intake/recirculation flaps toothed sectors.
  4. Unscrew the screws and separate the shells of the air intake/recirculation box flaps.
  5. Take out the air intake flap.
  6. Take out the recirculation flap.
Exploded diagram of the air intake/recirculation flap box, showing the upper and lower shells, flaps, levers, and fasteners

Refitting

  • Insert the air intake/recirculation flaps in the box lower shell.

Note: The flap shafts have different diameters to determine the correct assembly position.

  • Assemble the upper shell of the air intake/recirculation flaps box and fasten with the screws.
  • Insert the air intake/recirculation flaps toothed sectors.

Note: The toothed sectors have a reference notch that determines the correct assembly position.

  • Insert the air intake/recirculation flaps control lever.
  • Assemble the air intake/recirculation flaps control on the lever.
  • Assemble fan air conveyer half-shell and fasten with the screws.
  • Reposition the wiring bundle on the heater left half-box.
  • Assemble the fan air conveyer with the air intake/recirculation flaps on the heater left half-box, fasten with the screws and a new rivet.
  • Insert the lower/front air distribution flap.
  • Insert the upper air distribution flap.
  • Assemble the heater right half-box and fasten with the screws.
  • Insert the air distribution flap toothed sectors.

Note: Assemble the small toothed sectors according to the position marked at disassembly.

(Cont.d.)

Parts & tools for this job For 1998 Fiat Seicento

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.