Workshop Manuals Factory service & repair Fiat
01 General information02 Specifications03 Manufacturing data and tolerances04 Tightening torques05 Fluids and lubricants06 Maintenance07 Diagnostic checks08 Engine09 Clutch10 Gearbox and differential11 Axles and driveshafts12 Brakes13 Steering14 Suspension and wheels15 Heating, air conditioning and auxiliary units16 Electrical equipment17 Body fittings18 Body panels and frame19 Wiring diagrams and electrical functions20 Wiring harnesses21 Connectors and pin-outs22 Fault diagnosis23 Special tools
Fiat Bravo Factory Service Manual (2007-2014)19 · Wiring diagrams and electrical functions
19 · Electrical

Air conditioner - functional description

Make
Fiat
Model
Bravo Factory Service Manual
Year
2007–2014
Section
Climate control system › Air conditioner - functional description
Wiring diagrams and electrical functionsAir conditioner - functional description

AIR CONDITIONER - FUNCTIONAL DESCRIPTION

Manual Air Conditioning

FUNCTIONAL DESCRIPTION

The fan N85 receives an ignition operated power supply (INT/A) from a line protected by fuse F31 of the junction unit under the dashboard B2 and controlled by relay T8 and dedicated fuse F8 of the engine compartment junction unit B1.

Control knob H81 controls the fan at different speeds via regulator O30: the command signal varies according to the position of the control knob and the resistances of regulator O30 to determine four different voltage signals for the fan N85 which turns at 4 different speeds.

the fan N85 is operated at the first speed if the compressor engagement button is pressed, even if the control knob H81 is in position "0"

See E6021 COMPRESSOR ENGAGEMENT

Outside air intake/recirculation flap motor N82 is controlled by a button located in control unit H80: The engagement of the button sends an earth signal and a power supply signal - ignition operated line (INT) protected by fuse F51 of the junction unit under the dashboard B2 - which are inverted in order to invert the rotation of the motor.

Automatic air conditioning

FUNCTIONAL DESCRIPTION

The climate control system control unit M70 receives an ignition-controlled power supply (INT) at pin 1 of connector C from the line protected by fuse F51 of the junction unit under the dashboard B2; it receives a direct power supply at pin 12 of connector C from the line protected by fuse F39 of the junction unit under the dashboard B2. Pin 6 of connector C of M70 is earthed.

Control unit M70 is connected, via the CAN line, from pins 2 and 3 of connector C to the Body Computer M1 and to the other nodes exchanging the following signals:

- outside temperature signal;

- speedometer signal;

- windscreen washer engagement signal for activating recirculation;

- window closing control; - battery voltage signal.

See E1050 CAN CONNECTION LINES

Sensors K111 and K113 (right and left lower treated air) and K110 and K112 (right and left upper treated air) are connected to control unit M70: these sensors receive a reference earth from pin 14 of connector A and send the signals to pins 11, 1, 12 and 10 of connector A of M70.

The solar sensor K90 informs the control unit of the heat coming from the sun''s rays: it receives a 5V power supply from pin 18 of connector A of control unit M70 and gives out two signals: to pin 7 for the right area, to pin 6 for the left area.

The exhaust gas presence sensor (A.Q.S.) K64 provides a recirculation control signal when the air pollution index exceeds the pre-set harmful levels: it receives a power supply at pin 1 from the ignition-controlled line (INT) protected by fuse F51 of the junction unit under the dashboard B2; pin 2 is earthed and pin 3 sends a signal to pin 10 of connector C of M70.

The sensor which measures the outside temperature is located on the passenger door mirror P61: the sensor is connected to Body Computer M1 and from there, via the CAN, to M70.

The Body Computer M1 receives a direct supply from the battery via the line protected by maxifuse B99 at pin 18 of connector F of the interface with the junction unit under the dashboard B2; the ignition-controlled supply (INT) reaches pin 9 of connector F of the interface with the junction unit B2.

Mixer actuators N78 and N79 are controlled by control unit M70 from pins 9-11 and 3-4 respectively of connector B, they receive a power supply for control of the potentiometer from pin 17 of connector A of M70, a referenence earth from pin 14 of connector A of M70, and send a feedback signal to pins 2 and 3 of M70.

Distribution actuators N83 and N80 are controlled by control unit M70 from pins 12-10 and 5-6 respectively of connector B, they receive a power supply for control of the potentiometer from pin 17 of connector A of M70, a referenence earth from pin 14 of connector A of M70, and send a feedback signal to pins 12 and 13 of connector A of M70.

Recirculation actuator N82 is controlled by control unit M70 by pins 1 and 2 of connector B.

The fan N85 (with built-in electronic speed adjustment) receives an ignition-controlled power supply (INT/A) from the line protected by fuse F31 of the junction unit under the dashboard B2 and controlled by relay T8 and dedicated fuse F8 of the engine compartment junction unit B1; it receives an input control signal from the control unit for the various speeds from pin 11 of connector C of M70 and returns a feedback signal to pin 8 of connector A of M70.

Pin 4 of connector C of M70 controls compressor activation:

See E6021 COMPRESSOR ENGAGEMENT

Pins 7 and 8 of connector B of M70 control the engagement of the additional electric heater:

See E6015 ADDITIONAL HEATER

Parts & tools for this job For 2007 Fiat Bravo

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.