Workshop Manuals Factory service & repair Fiat
01 General information02 Specifications03 Manufacturing data and tolerances04 Tightening torques05 Fluids and lubricants06 Maintenance07 Diagnostic checks08 Engine09 Clutch10 Gearbox and differential11 Axles and driveshafts12 Brakes13 Steering14 Suspension and wheels15 Heating, air conditioning and auxiliary units16 Electrical equipment17 Body fittings18 Body panels and frame19 Wiring diagrams and electrical functions20 Wiring harnesses21 Connectors and pin-outs22 Fault diagnosis23 Special tools
Fiat Croma Factory Service Manual (2005-2010)08 · Engine
08 · Engine

Turbocharger intercooler - r + r

Make
Fiat
Model
Croma Factory Service Manual
Year
2005–2010
Section
Engine air supply circuit › Turbocharger intercooler - r + r
EngineTurbocharger intercooler - r + r

TURBOCHARGER INTERCOOLER - R + R

Operation 1048B50 · PRESSURE AIR CIRCUIT

1.9 JTD 8v, 1.9 JTD 16v

Removing

- Position the vehicle on a lift.

Op. 7210E10 R.R. FRONT BUMPER

Op. 1016A10 SOUND-PROOFING COVER - R.R

Op. 1048B19 TURBOCHARGER AIR OUTLET HOSE -R.R.

Op. 1048A42 SLEEVE FROM FLOW METER TO TURBO CHARGER AIR INLET PIPE - R + R

Op. 7055B54 UNDER ENGINE PROTECTION/GUARD - R.R.

Op. 1048B17 HEAT EXCHANGER AIR INLET HOSE - R.R.

Op. 7040D30 ENGINE BAY FRONT BEAM COVER - R R

Op. 1048B10 RIGID SUPPLY PIPE (ONE) BETWEEN TURBOCHARGER AND HEAT EXCHANGER -R.R.

Op. 0010T84 COOLANT FOR AIR CONDITIONING SYSTEM - DEHYDRATE AND REPRESSURIZE

Op. 5530B10 BATTERY - R+R

Op. 5530B52 BATTERY SUPPORT/DRIP TRAY - R.R

Op. 1048B20 AIR SUPPLY HOSE FROM HEAT EXCHANGER TO RIGID PIPE - REPLACE

Op. 1064B42 SOLENOID CONTROLLING TURBOCHARGER VANE POSITION ACTUATOR - R.R

Op. 1088E11 FANS WITH SINGLE ENGINE DUCT - R+R

Op. 1088B20 ENGINE COOLING RADIATOR - R + R

1. Undo the bolts (1a) and remove the air duct (1b) from the supercharging air/air heat exchanger.

TURBOCHARGER INTERCOOLER - R + R

1. Undo the bolts (1a) and release the supercharging air/air heat exchanger (1b) from the air conditioning condenser (1c).

TURBOCHARGER INTERCOOLER - R + R

Refitting

- Fasten the supercharging air/air heat exchanger to the air conditioning condenser and tighten the fixing bolts.

- Place the air duct in its housing on the supercharging air/air heat exchanger and secure it using the bolts.

Op. 1088B20 ENGINE COOLING RADIATOR - R + R

Op. 1088E11 FANS WITH SINGLE ENGINE DUCT - R+R

Op. 1064B42 SOLENOID CONTROLLING TURBOCHARGER VANE POSITION ACTUATOR - R.R

Op. 1048B20 AIR SUPPLY HOSE FROM HEAT EXCHANGER TO RIGID PIPE - REPLACE

Op. 5530B52 BATTERY SUPPORT/DRIP TRAY - R.R

Op. 5530B10 BATTERY - R+R

Op. 0010T84 COOLANT FOR AIR CONDITIONING SYSTEM - DEHYDRATE AND REPRESSURIZE

Op. 1048B10 RIGID SUPPLY PIPE (ONE) BETWEEN TURBOCHARGER AND HEAT EXCHANGER -R.R.

Op. 7040D30 ENGINE BAY FRONT BEAM COVER - R R

Op. 1048B17 HEAT EXCHANGER AIR INLET HOSE - R.R.

Op. 1048A42 SLEEVE FROM FLOW METER TO TURBO CHARGER AIR INLET PIPE - R + R

Op. 1048B19 TURBOCHARGER AIR OUTLET HOSE -R.R.

Op. 1016A10 SOUND-PROOFING COVER - R.R

Op. 7210E10 R.R. FRONT BUMPER

Op. 0010T20 ENGINE COOLANT - CHANGE

Op. 7055B54 UNDER ENGINE PROTECTION/GUARD - R.R.

- Remove the vehicle from the lift.

2.4 JTD 20v

Removing

- Position the vehicle on a lift.

- Make sure that the ignition key is in the OFF position, then disconnect the battery terminal (-).

Op. 0010T84 COOLANT FOR AIR CONDITIONING SYSTEM - DEHYDRATE AND REPRESSURIZE

Op. 7040D30 ENGINE BAY FRONT BEAM COVER - R R

Op. 7055B54 UNDER ENGINE PROTECTION/GUARD - R.R.

Op. 7210E10 R.R. FRONT BUMPER

Op. 5040A40 AIR CONDITIONING CONDENSER - R+R

1. Loosen the band and disconnect the air supply hose between the turbocharger and the heat exchanger, heat exchanger side.

TURBOCHARGER INTERCOOLER - R + R

1. Loosen the band and disconnect the air supply hose between the heat exchanger and the rigid pipe.

TURBOCHARGER INTERCOOLER - R + R

1. Undo the upper bolts fixing the air/air heat exchanger.

2. Lift up and remove the supercharging air/air heat exchanger releasing it from the engine cooling radiator brackets.

TURBOCHARGER INTERCOOLER - R + R

Refitting

- Place the supercharging air/air heat exchanger in its housing securing it using the engine cooling radiator brackets.

- Tighten the upper bolts fixing the supercharging air/air heat exchanger.

- Connect the air supply hose from the heat exchanger to the rigid pipe and secure it using the band.

- Connect the air supply hose between the turbocharger and the heat exchanger, heat exchanger side, and tighten the band.

Op. 5040A40 AIR CONDITIONING CONDENSER - R+R

Op. 7210E10 R.R. FRONT BUMPER

Op. 7055B54 UNDER ENGINE PROTECTION/GUARD - R.R.

Op. 7040D30 ENGINE BAY FRONT BEAM COVER - R R

Op. 0010T84 COOLANT FOR AIR CONDITIONING SYSTEM - DEHYDRATE AND REPRESSURIZE

- Connect the negative battery terminal.

- Remove the vehicle from the lift.

Parts & tools for this job For 2005 Fiat Croma

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.