Workshop Manuals Factory service & repair Fiat
01 00 General information and technical data02 10 Engine03 18 Clutch04 21 Gearbox and differential05 27 Axle06 33 Braking system07 41 Steering08 44 Suspension and wheels09 50 Auxiliary units10 55 Electrical equipment11 70 Bodywork12 Diagnosis13 Tests14 Wiring diagrams
Fiat Seicento Factory Service Manual (1998-2010)02 · 10 Engine
02 · Engine

Refitting

Make
Fiat
Model
Seicento Factory Service Manual
Year
1998–2010
Section
Petrol injection fuel supply (1108) › Refitting
10 EngineRefitting

(Cont. Op. 1056A56)

Refitting

  • Assemble the idle actuator and fasten with its screws.

Note: Check the seal ring integrity and remove any impurities from the throttle case seat.

  • Connect the idle actuator electrical connection
NameConnector
- Idle actuatorN74
  • Insert the fuel return pipe on the throttle case.
  • Complete with Op. 1048A10 COMPLETE AIR CLEANER - R+R.
  • Connect the negative (-) battery terminal
NameConnector
- BatteryA1

Note: Leave the battery terminal disconnected for at least 20 minutes to allow the injection / ignition control unit to position the idle actuator correctly at the first engine ignition.

  • Remove the body protection cover.
  • Close the engine compartment.

1056A70 - SINGLE INJECTOR GROUP- R+R

Removal

  • Open the engine compartment.
  • Assemble the body protection covers.
  • Disconnect the negative (-) battery terminal.
NameConnector
- BatteryA1
  • Follow Op. 1048A10 COMPLETE AIR CLEANER - R.R.
  1. Disconnect the single injector electrical connection
NameConnector
1 Single injector (SPI)N71
  1. Unscrew screw (2a) that fastens the single injector (2b) and remove it.
Diagram showing single injector assembly with callout numbers 1, 2a, and 2b

If it should be necessary to replace the single injector the entire throttle case cover must be replaced.

Refitting

  • Assemble the single injector and fasten with its screws.
  • Electrically connect the single injector
NameConnector
- Single injector (SPI)N71
  • Complete with Op. 1048A10 COMPLETE AIR CLEANER - R+R.
  • Connect the negative (-) battery terminal
NameConnector
- BatteryA1
  • Remove the body protection cover.
  • Close the engine compartment.

1056A82 - INJECTION / IGNITION CONTROL UNIT(ONE) - R+R

Removal

  • Open the engine compartment.
  • Assemble the body protection covers.
  • Disconnect the battery (-) terminal

(Cont.)

Parts & tools for this job For 1998 Fiat Seicento

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.