Pcm and generator shearing inspection
- Make
- Mazda
- Model
- MX-5 (NC) Factory Workshop Manual
- Year
- 2006–2008
- Section
- Charging System › Pcm and generator shearing inspection
ElectricalPcm and generator shearing inspection
will not be verified although the generator is normal. In this case, increase the electrical load (by turning on the headlight and leave it for a while, then discharge the battery or by similar methods) and recheck.
- When the generator itself or the ambient temperature are too high, the specified current cannot be verified. In this case, cool down the generator and recheck.
- Turn the following electrical loads on and verify that the current reading increases more than the minimum value indicated below.
- If it is not as specified, go to the PCM AND GENERATOR SHEARING INSPECTION.
- Headlights (high-beam)
- Blower motor (HI)
- Rear window defroster
- Brake light
Generator generated current minimum value
70% of the nominal output current (nominal output current: 100 A)
[ambient temp. 20°C {68°F}, voltage 13.0-15.0 V, both engine and generator are hot]
PCM AND GENERATOR SHEARING INSPECTION
- Connect the M-MDS or equivalent to the DLC-2.
Parts & tools for this job For 2006 Mazda MX-5
- TOOLBattery testerSearch: car battery tester
- TOOLDigital multimeterSearch: automotive digital multimeter
- TOOLBattery terminal cleanerSearch: battery terminal cleaner
As an Amazon Associate we earn from qualifying purchases.