Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder diesel engine (2.0 l engine, common rail)02 4-cylinder injection engine (2.0 l direct injection engine, turbocharger)03 Fuel supply system - Petrol engines04 Fuel supply system - Diesel engines05 Transfer box and final drive06 6-speed manual gearbox 0C607 8-speed automatic gearbox 0CM08 Running gear: Guide for using trailers09 Wheels and Tyres Guide - General Information10 Running gear: Guide for increasing and decreasing load ratings11 Wheels and Tyres Guide12 Brake systems13 Running gear, axles, steering14 Heating, air conditioning15 Heating and air conditioning: Auxiliary heater16 Electrical System, General Information17 Electrical system18 Electrical: Communication19 General body repairs, exterior20 General body repairs, interior
Volkswagen Amarok 2H (2010-2020)04 · Fuel supply system - Diesel engines
04 · Engine

Preparing replacement part

Make
Volkswagen
Model
Amarok 2H
Year
2010–2020
Section
Fuel pump › Preparing replacement part
Fuel supply system - Diesel enginesPreparing replacement part

Preparing replacement part

Replacement parts

  • Middle pillar (B-pillar) reinforcement
N51-11965

Transfer parting cut (1) from body to new part.

Make parting cut and remove shaded area.

Drill specified holes in new part, 7.0 mm in diameter.

Sand welding surfaces down to bare metal.

Parts & tools for this job For 2010 Volkswagen Amarok

As an Amazon Associate we earn from qualifying purchases.