Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder diesel engine (2.0 l engine, common rail)02 4-cylinder injection engine (2.0 l direct injection engine, turbocharger)03 Fuel supply system - Petrol engines04 Fuel supply system - Diesel engines05 Transfer box and final drive06 6-speed manual gearbox 0C607 8-speed automatic gearbox 0CM08 Running gear: Guide for using trailers09 Wheels and Tyres Guide - General Information10 Running gear: Guide for increasing and decreasing load ratings11 Wheels and Tyres Guide12 Brake systems13 Running gear, axles, steering14 Heating, air conditioning15 Heating and air conditioning: Auxiliary heater16 Electrical System, General Information17 Electrical system18 Electrical: Communication19 General body repairs, exterior20 General body repairs, interior
Volkswagen Amarok 2H (2010-2020)04 · Fuel supply system - Diesel engines
04 · Engine

Removing

Make
Volkswagen
Model
Amarok 2H
Year
2010–2020
Section
Fuel pump › Removing
Fuel supply system - Diesel enginesRemoving

Removing

Note

  • Make parting cuts with pneumatic jig-saw V.A.G 1523B only.
  • Make the parting cuts straight, and make sure not to damage the inner reinforcements.

N51-13001

Mark and make parting cut (1).

Separate original joint.

Heat bonding surface Item with hot air blower V.A.G 1416, and detach bonded joint.

Note

  • Make parting cut (1) so that a shoulder (2) of approx. 5 mm in height or width remains from the old part.

N51-13002

Mark parting cut (1) and carry out.

Separate original joint.

Remove roof side member from body.

Note

  • Remove as much of the foam residue (1) as possible before starting grinding work.

N51-13003

Remove remaining material.

Sand welding surfaces down to bare metal.

Prepare moulded foam insert for installation → Chapter.

N51-13004

Sand welding surfaces down to bare metal.

Parts & tools for this job For 2010 Volkswagen Amarok

As an Amazon Associate we earn from qualifying purchases.