Welding in
- Make
- Volkswagen
- Model
- Amarok 2H
- Year
- 2010–2020
- Section
- Fuel pump › Welding in
Welding in

Adapt longitudinal member (1) with chassis seated on alignment bracket set and fix in place.
Weld parting cut (6) all around in longitudinal member (1) adhering to (air gap dimension a), SG continuous weld seam.
Note
- Adherence to (air gap dimension a) is vital to guarantee proper through-welding.
- Before welding longitudinal member, check welder settings; weld several “test seams” and check roots of “test weld seams” (correct welding parameters if necessary).
- SG continuous weld seam must not be reworked (ground or smoothed)!
From above, weld cross member (3) to longitudinal member (1), SG continuous weld seam.
Adapt load surface mounting (2), leaf spring mounting (4) and load surface mounting (5) with chassis seated on alignment bracket set and fix in position.
Weld in new parts (2), (4) and (5), SG continuous weld seam.

Weld cross member and leaf spring mounting to longitudinal member from below, SG continuous weld seam.

Adjust longitudinal member reinforcement (2) to longitudinal member (1) and fix in position.
Weld in longitudinal member reinforcement (2) all around, SG continuous weld seam.
Seal cavities on rear longitudinal member.
Install load surface General body repairs, exteriorRep. gr.55Load surface.Parts & tools for this job For 2010 Volkswagen Amarok
- PARTFuel filterSearch: Volkswagen Amarok 2010 fuel filter
- TOOLFuel pressure test kitSearch: fuel pressure test kit
- TOOLFuel line disconnect toolSearch: fuel line disconnect tool
As an Amazon Associate we earn from qualifying purchases.