Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder diesel engine (2.0 l engine, common rail)02 4-cylinder injection engine (2.0 l direct injection engine, turbocharger)03 Fuel supply system - Petrol engines04 Fuel supply system - Diesel engines05 Transfer box and final drive06 6-speed manual gearbox 0C607 8-speed automatic gearbox 0CM08 Running gear: Guide for using trailers09 Wheels and Tyres Guide - General Information10 Running gear: Guide for increasing and decreasing load ratings11 Wheels and Tyres Guide12 Brake systems13 Running gear, axles, steering14 Heating, air conditioning15 Heating and air conditioning: Auxiliary heater16 Electrical System, General Information17 Electrical system18 Electrical: Communication19 General body repairs, exterior20 General body repairs, interior
Volkswagen Amarok 2H (2010-2020)04 · Fuel supply system - Diesel engines
04 · Engine

Removing

Make
Volkswagen
Model
Amarok 2H
Year
2010–2020
Section
Fuel pump › Removing
Fuel supply system - Diesel enginesRemoving

Removing

For vehicles with single and double cab

Note

  • Make parting cuts with pneumatic jig-saw V.A.G 1523B only.
  • Parting cuts must be straight.
  • Do not damage inner reinforcements when carrying out parting cuts.

N51-11950

Mark parting cut (1) as per Item (400 mm from top edge of windscreen aperture) and cut.

Mark parting cut (2) as per Item (250 mm from centre of hole) and cut.

Separate original joint.

Release bonded joint Item. To release, heat bonded surface with hot air blower V.A.G 1416.

Remove hinge pillar (A-pillar) from body.

N51-11951

Remove remaining material.

Remove adhesive residues and sand bonding surfaces back to bare metal.

Sand welding surfaces down to bare metal.

Prepare moulded foam inserts (1) for installation → Chapter.

Parts & tools for this job For 2010 Volkswagen Amarok

As an Amazon Associate we earn from qualifying purchases.