Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder diesel engine (2.0 l engine, common rail)02 4-cylinder injection engine (2.0 l direct injection engine, turbocharger)03 Fuel supply system - Petrol engines04 Fuel supply system - Diesel engines05 Transfer box and final drive06 6-speed manual gearbox 0C607 8-speed automatic gearbox 0CM08 Running gear: Guide for using trailers09 Wheels and Tyres Guide - General Information10 Running gear: Guide for increasing and decreasing load ratings11 Wheels and Tyres Guide12 Brake systems13 Running gear, axles, steering14 Heating, air conditioning15 Heating and air conditioning: Auxiliary heater16 Electrical System, General Information17 Electrical system18 Electrical: Communication19 General body repairs, exterior20 General body repairs, interior
Volkswagen Amarok 2H (2010-2020)04 · Fuel supply system - Diesel engines
04 · Engine

Removing

Make
Volkswagen
Model
Amarok 2H
Year
2010–2020
Section
Fuel pump › Removing
Fuel supply system - Diesel enginesRemoving

Removing

N53-11058

Separate original joint.

Release bonded joints (1), (2) and (3). To release, heat bonded surfaces with hot air blower V.A.G 1416.

N53-11059

Separate original joint.

Drill open original joint (2) through 2 material thicknesses.

Release bonded joint (1). To release, heat bonded surface with hot air blower V.A.G 1416.

Remove rear side panel from load surface.

Release original joint from bracket (2).

Release bonded joint (1). To release, heat bonded surface with hot air blower V.A.G 1416.

Remove bracket (2) from load surface.

N53-11061

Remove remaining material.

Remove adhesive residues and sand bonding surfaces back to bare metal.

Sand welding surfaces down to bare metal.

N53-11060

Parts & tools for this job For 2010 Volkswagen Amarok

As an Amazon Associate we earn from qualifying purchases.