Workshop Manuals Factory service & repair Volkswagen
01 4-cylinder diesel engine (2.0 l engine, common rail)02 4-cylinder injection engine (2.0 l direct injection engine, turbocharger)03 Fuel supply system - Petrol engines04 Fuel supply system - Diesel engines05 Transfer box and final drive06 6-speed manual gearbox 0C607 8-speed automatic gearbox 0CM08 Running gear: Guide for using trailers09 Wheels and Tyres Guide - General Information10 Running gear: Guide for increasing and decreasing load ratings11 Wheels and Tyres Guide12 Brake systems13 Running gear, axles, steering14 Heating, air conditioning15 Heating and air conditioning: Auxiliary heater16 Electrical System, General Information17 Electrical system18 Electrical: Communication19 General body repairs, exterior20 General body repairs, interior
Volkswagen Amarok 2H (2010-2020)04 · Fuel supply system - Diesel engines
04 · Engine

Preparing replacement part

Make
Volkswagen
Model
Amarok 2H
Year
2010–2020
Section
Fuel pump › Preparing replacement part
Fuel supply system - Diesel enginesPreparing replacement part

Preparing replacement part

Replacement parts

  • Propshaft cross member
  • Reinforcing ring

Note

  • To allow the new part to be fitted into the chassis, a reinforcing ring must be detached from the new part. When making the parting cut (3), reinforcing ring is detached. The new part (1) must not be damaged when doing this.

N50-11599

Carefully make parting cut on reinforcing ring (3).

Remove half of reinforcing ring.

Remove remaining material of weld seam (2).

Sand welding surfaces (4) down to bare metal.

Sand all remaining welding surfaces down to bare metal.

Sand welding surfaces on new reinforcing ring (2) down to bare metal.

N50-11602

Slide new reinforcing ring (2) in (direction of arrow) onto new part (1).

Parts & tools for this job For 2010 Volkswagen Amarok

As an Amazon Associate we earn from qualifying purchases.