Workshop Manuals Factory service & repair Fiat
01 00 Introduction and technical data02 10 Engine03 18 Clutch04 21 Gearbox and differential05 33 Braking system06 41 Steering07 44 Suspension and wheels08 50 Auxiliary units09 55 Electrical system10 70 Bodywork
Fiat Bravo/Brava (182) Factory Service Manual (1995-2001)02 · 10 Engine
02 · Engine

Removing test equipment (page 3 of 3)

Make
Fiat
Model
Bravo /Brava (182) Factory Service Manual
Year
1995–2001
Section
Fuel system (99 range, 1747 16v)
10 EngineRemoving test equipment · page 3 of 3

Before removing the manifold, drain the pressure inside it as described at the beginning of this chapter.

Remove the manifold, proceeding as follows:

  • release the front and rear springs (arrow) attaching the cable holder duct to the manifold;
  • disconnect the electrical connectors from the injectors and the phase transformer and move the duct released previously aside;
  • disconnect the fuel supply pipe (1) from the manifold, working in two stages:
  1. press the retaining springs, at the same time pushing the end of the pipe, in the direction shown, to release the housing;
  2. keep the springs pressed and extract the end from the manifold;
  • undo the two bolts (arrow) fixing the manifold and remove it.

The injectors do not have clips: to remove them, simply release them from their housing (see detail).

Illustrates engine valve cover removal with arrowed instructions
Illustrates disconnecting and reconnecting fuel line connector
Removing fuel injectors from engine compartment

Parts & tools for this job For 1995 Fiat Bravo

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.