Workshop Manuals Factory service & repair Land Rover
01 Engine - Td402 Engine - K Series 1.803 Engine - K Series KV604 Emission control - Td405 Emission control - K Series 1.806 Emission control - K Series KV607 Engine management system - EDC08 Engine management system - MEMS09 Engine management system - siemens (all except NAS)10 Engine management system11 Fuel delivery system - Td412 Fuel delivery system - K Series 1.813 Fuel delivery system - K Series KV614 Cooling system - Td415 Cooling system - K Series 1.816 Cooling system - K Series KV617 Manifold and exhaust system - Td418 Manifold and exhaust system - K Series 1.819 Manifold and exhaust system - K Series KV620 Clutch21 Manual gearbox - Getrag22 Intermediate reduction drive23 Automatic gearbox - Jatco24 Driveshafts25 Rear axle and final drive26 Steering27 Front suspension28 Rear suspension29 Brakes30 Restraint systems31 Heating and ventilation32 Air conditioning33 Wipers and washers34 Control units35 Communication data buses36 Security37 Windows38 Navigation system39 Instruments
Land Rover Freelander System Description and Operation (UK)10 · Engine management system
10 · Engine

Operation

Make
Land Rover
Model
Freelander System Description and Operation (UK)
Section
Siemens (NAS) – description and operation › Operation
Engine management systemOperation

Operation

Engine Starting

When the ignition switch is in position II a power feed is connected from the ignition switch to the ECM relay and the ECM. The ECM then initiates 'wake up' routines and energises the main and fuel pump relays.

When the engine cranks, provided a valid mobilisation signal is received from the immobilisation ECU, the ECM initiates throttle control, fuelling and ignition to start and maintain control of the engine as necessary to meet driver demand. If no mobilisation code is received from the immobilisation ECU, or the code is invalid, the ECM inhibits fuel injection and ignition to prevent the engine from starting.

The electrical circuit from the fuel pump relay to the fuel pump is routed through the fuel cut-off inertia switch, located below the E-box in the engine compartment. In the event of a collision the switch breaks the circuit to prevent further fuel being delivered to the engine. The switch is reset by pressing down the centre of the rubber cover on the top of the switch.

During the start sequence, the ECM also illuminates the MIL, as a bulb check. While the ignition switch is in position II the MIL is continuously illuminated. The MIL is extinguished when the ignition switch turns to position III and the engine starts.

Engine Stopping

When the ignition switch is turned to position I, the ECM switches off the ignition coils and fuel pump to stop the engine and the ECM relay de-energises to disconnect the power feed to the fuel injectors. The ECM continues to energise the main relay until the power down functions are completed. Power down functions include the fuel tank leak check, engine cooling and memorising data for the next start up. If neither a fuel tank lank check nor engine cooling are required, the power down process takes approximately 10 seconds.

When the power down process is completed, the ECM de-energises the main relay and enters a low power mode. In the low power mode, maximum quiescent drain is 0.5 mA.

Parts & tools for this job For Land Rover Freelander

Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.