Description (page 9 of 10)
- Make
- Alfa Romeo
- Model
- 145/146 Engines, 146 Bodywork and Engine Overhaul Manual
- Year
- 1994–2001
- Section
- Removal/Refitting
1.9 JTD engine (1910)Description · page 9 of 10
- Slacken the nut fastening the power unit rear stiff support to its flexible pad.
- Slacken the screws fastening the power unit rear support flexible pad to the suspension crossmember.
- Lower the hydraulic jack and remove the power unit from the engine compartment.
WARNING: The hydraulic jack used for removing the power unit must have a capacity of at least 1000 kg.
- Support the power unit with a hydraulic hoist as well as with the hydraulic jack used for removal.
WARNING: For moving the power unit use a hydraulic hoist after freeing it from the hydraulic jack.
- Release the power unit from the support tools, then place it on a special work bench.
- Scollegare e rimuovere il cablaggio elettrico dal gruppo motopropulsore.
- Slacken the fastening screws and remove the starter motor.
- Slacken the fasteners and remove the gearbox/differential unit from the engine.
- Slacken the fastening screws, then remove the clutch box complete with thrust bearing and clutch plate.
49 ÷ 23 Nm
1.9 ÷ 2.3 kgm
| M10 | M12 |
|---|---|
| 37 ÷ 45 Nm (3.8 ÷ 4.6 kgm) | 68 ÷ 84 Nm (6.9 ÷ 8.5 kgm) |
Parts & tools for this job For 1994 Alfa Romeo 145/146
- PARTEngine gasket setSearch: Alfa Romeo 145/146 1994 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.