Workshop Manuals Factory service & repair Mazda
01 General information02 Engine03 Engine performance04 Transmission05 Driveline and axles06 Suspension07 Brakes08 Steering09 Restraints10 Heating and air conditioning11 Electrical12 Accessories and equipment13 Body and cab accessories
Mazda MX-5 (NC) Factory Workshop Manual (2006-2008)05 · Driveline and axles
05 · Transmission

Ring gear assembly note

Make
Mazda
Model
MX-5 (NC) Factory Workshop Manual
Year
2006–2008
Section
Differential › Ring gear assembly note
Driveline and axlesRing gear assembly note
  1. Align the differential gear case and pinion shaft pin holes.
  2. Tap the roll pin in using a pin punch.

RING GEAR ASSEMBLY NOTE

CAUTION: The gear case and ring gear could be damaged if the ring gear is installed with old thread-locking compound remaining on the bolt threads. Before installing the ring gear, completely remove the old thread-locking compound from the bolt threads.

  1. Apply a small amount of thread-locking compound to each of points A on the back of the ring gear, and bolt thread areas B (around the entire ring).

Application thickness

Back of ring gear points A:

Approx. 0.4 cm3 {0.4 cc, 0.024 cu in} (1 location approx. 0.04 cm3 {0.04 cc, 0.0024 cu in})

Ring gear bolt thread points B:

Approx. 0.4 cm3 {0.4 cc, 0.024 cu in} (1 location approx. 0.04 cm3 {0.04 cc, 0.0024 cu in})

DRIVELINE/AXLES – Differential – figure

Parts & tools for this job For 2006 Mazda MX-5

As an Amazon Associate we earn from qualifying purchases.