landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

Rocker shaft - overhaul|Page 268 > < Timing chain and gears
Page 214
background image

ENGINE - V8

OVERHAUL 12-2-59

Reassembly

1. Clean timing chain and gears and gear  

locations. 

2. Fit key to crankshaft. 

3. Temporarily fit gears to camshaft and  

crankshaft. If necessary, rotate shafts to  align 
timing marks. When aligned correctly, the 
timing  marks will face each other; crankshaft  
gear timing mark at twelve o'clock  position and 
camshaft gear timing  mark at six o'clock 
position. 

4. Remove gears from shafts and fit to  timing 

chain. 

5. With timing marks aligned, fit timing  chain and 

gears as an assembly. 

6. Restrain the camshaft gear and  tighten 

retaining bolt to 50 Nm (37 lbf.ft). 

7. Fit timing gear cover gasket. 

 

 + 

 ENGINE - V8, OVERHAUL, Gasket - 

timing gear cover.

Rocker shaft - overhaul  

$% 12.29.49  

If both rocker shafts are to be  removed, identify 
each assembly to ensure  refitment to original 
cylinder head. 
 

Disassembly

1. Release ht leads from rocker covers. 

2. Noting fitted position of 4 long screws or multi-

hex bolts, remove and discard 8 screws/bolts 
securing rocker covers; remove rocker covers.

CAUTION: Screws/bolts must be replaced 
with new 'patched' multi-hex bolts.

Rocker shaft - overhaul|Page 268 > < Timing chain and gears