Rear and Side Rail - Nissan 240SX 1991-1992 Workshop Manual
- Make
- Nissan and Datsun
- Model
- 240SX Nissan 240SX 1991-92 Workshop Manual
- Section
- General › Rear and Side Rail - Nissan 240SX 1991-1992 Workshop Manual
Rear and Side Rail
REAR AND SIDE RAIL
18-5
TOP STACK ADJUSTMENT (cont'd)
(b) Loosen jam nut and adjust upstop as required. (c) Tighten jam nut. *k dation Torque: 17 Nm (13 ft. Ib.)
CHECK TOP UPSTOP ADJUSTMENT.
4.
(a) Cycle top up and down two (2) times latching top to header each time. (6) Check for: (1) dowel pin to receiver alignment; (2) effort required to pull No. 1 bow to header when latching.
SIDE RAIL ADJUSTMENT
NOTE: When checking side rail alignment, it is important to also consider door and quarter glass alignment.
RAISE AND LATCH TOP TO WINDSHIELD HEADER.
RAISE DOOR AND QUARTER GLASS.
CHECK SIDE RAIL WEATHERSTRIP-TO-GLASS ALIGNMENT.
NOTE: Door and quarter glass alignment must be correct before checking weatherstrip seal. Side rail weatherstrip should be parallel to top edge of door and quarter glass while maintaining a satisfactory seal.
“event
ADJUST FRONT AND CENTER RAIL ALIGNMENT.
(a) Raise top to expose adjustment screw at end of front rail -D assembly. Ww.
NOTE: Be sure plastic retainer “button” is in center rail assembly.
Parts & tools for this job For Nissan 240SX
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Nissan 240SX
As an Amazon Associate we earn from qualifying purchases.