Rear and Side Rail - Nissan 240SX 1991-1992 Workshop Manual
- Make
- Nissan and Datsun
- Model
- 240SX Nissan 240SX 1991-92 Workshop Manual
- Section
- General › Rear and Side Rail - Nissan 240SX 1991-1992 Workshop Manual
‹ Prev Rear and Side Rail - Nissan 240SX 1991-1992 Workshop ManualNext › Rear and Side Rail - Nissan 240SX 1991-1992 Workshop Manual
Rear and Side RailRear and Side Rail - Nissan 240SX 1991-1992 Workshop Manual
Rear and Side Rail
REAR AND SIDE RAIL
18-8
REAR RAIL AND MAIN PIVOT (cont'd)
RE-POSITION RETENTION CABLE.
10. Drive roll pin out of rear rail enough to allow removal of retentic cable.
REMOVE REAR RAIL ASSEMBLY.
11. Remove rear rail pivot bolt, washer and nut. (a) Remove rear rail from main pivot bracket. (b)
NOTE: If removing main pivot bracket ONLY, continu to step 12 on page 18-10.
DISASSEMBLE
REMOVE SEAL CARRIER FROM REAR RAIL.
1. Disconnect spring from seal carrier and rear rail. (a)
Remove two (2) bolts from seal carrier and seal carrier fr (b) rear rail.
REMOVE DOWN STOP ECCENTRIC BLOCK.
2. Note position of eccentric block, remove down stop screw ae block.
‹ Prev Rear and Side Rail - Nissan 240SX 1991-1992 Workshop ManualNext › Rear and Side Rail - Nissan 240SX 1991-1992 Workshop Manual
Parts & tools for this job For Nissan 240SX
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Nissan 240SX
As an Amazon Associate we earn from qualifying purchases.