Rear and Side Rail - Nissan 240SX 1991-1992 Workshop Manual
- Make
- Nissan and Datsun
- Model
- 240SX Nissan 240SX 1991-92 Workshop Manual
- Section
- General › Rear and Side Rail - Nissan 240SX 1991-1992 Workshop Manual
Rear and Side Rail
REAR AND SIDE RAIL
18-11
REAR RAIL AND MAIN PIVOT (cont'd)
in
3.
INSTALL REAR RAIL ASSEMBLY.
sket Apply Loctite (P/N 271 or equivalent) to bolt threads and secure rear rail to main pivot bracket using one bolt, washer, and nut. Torque: 22 N-m (16 ft. Ib.)
NOTE: Pull outward on seal carrier when installing rear rail to main pivot and insure guide button is positioned to main pivot “ramp” .
4.
POSITION RETENTION CABLE IN SEAL CARRIER SLOT AND
TAP ROLL PIN IN PLACE.
on.
ody
CONNECT REAR RAIL TO HYDRAULIC CYLINDER.
Align cylinder rod to rear rail and install clevis pin, washer and cotter pin.
INSTALL CENTER RAIL TO REAR RAIL.
Apply Loctite (P/N 271 or equivalent) to bolt threads and secure center rail to rear rail with bolt. Torque: 17 Nm (13 ft. Ib.) ded
ist
INSTALL BALANCE LINK TO MAIN PIVOT BRACKET.
Apply Loctite (P/N 271 or equivalent) to bolt threads and secure balance link to main pivot bracket with bolt. Torque: 17 Nm (13 ft. Ib)
nd
Parts & tools for this job For Nissan 240SX
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Nissan 240SX
As an Amazon Associate we earn from qualifying purchases.