Rear and Side Rail - Nissan 240SX 1991-1992 Workshop Manual
- Make
- Nissan and Datsun
- Model
- 240SX Nissan 240SX 1991-92 Workshop Manual
- Section
- General › Rear and Side Rail - Nissan 240SX 1991-1992 Workshop Manual
‹ Prev Rear and Side Rail - Nissan 240SX 1991-1992 Workshop ManualNext › Rear and Side Rail - Nissan 240SX 1991-1992 Workshop Manual
Rear and Side RailRear and Side Rail - Nissan 240SX 1991-1992 Workshop Manual
Rear and Side Rail
REAR AND SIDE RAIL
18-13
SIDE RAIL ASSEMBLY (cont'd)
REMOVE BOLT FROM NO. 2 BOW CONTROL LINK AND
3.
CENTER RAIL.
Remove bolt and bushing from side to be serviced.
REMOVE BOLT FROM NO. 3 BOW ASSEMBLY, CENTER
LINK AND REAR RAIL.
Remove boit and three (3) bushings.
REMOVE TWO (2) NUTS AND BOLTS FROM NO. 1 BOW.
REMOVE BOLT FROM CENTER RAIL AND BALANCE LINK.
Hold side rail assembly to prevent it from “pivoting” and remove bolt and two (2) bushings.
REMOVE CENTER RAIL TO REAR RAIL BOLT.
Hold side rail assembly and remove bolt and bushing.
‹ Prev Rear and Side Rail - Nissan 240SX 1991-1992 Workshop ManualNext › Rear and Side Rail - Nissan 240SX 1991-1992 Workshop Manual
Parts & tools for this job For Nissan 240SX
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Nissan 240SX
As an Amazon Associate we earn from qualifying purchases.