Workshop Manuals Factory service & repair Nissan and Datsun
01 QUICK REFERENCE INDEX02 Front Cover03 Foreword04 Table of Contents05 General Information06 Windshield Header Trim07 Windshield Header Molding08 Weatherstrips and Retainers09 Rear Seat10 Quarter Trim Panel11 Quarter Window and Regulator12 Door and Door Window13 Seat Belts14 Back and Quarter Belt Moldings15 Headliner Assembly16 Top Cover Assembly17 Backlite Assembly18 Stay Pads, Side and Rear19 No. 1 Bow20 No. 2 Bow21 No. 3 Bow22 No. 4 Bow23 Rear and Side Rail24 Hydraulic System25 Electrical26 Deck Lid Hinge and Trunk Trim27 Body Structural28 Index29 Back Cover30 QUICK REFERENCE CHART
Nissan and Datsun Nissan 240SX 1991-92 Workshop Manual23 · Rear and Side Rail
23 · General

Rear and Side Rail - Nissan 240SX 1991-1992 Workshop Manual

Make
Nissan and Datsun
Model
240SX Nissan 240SX 1991-92 Workshop Manual
Section
General › Rear and Side Rail - Nissan 240SX 1991-1992 Workshop Manual
Rear and Side RailRear and Side Rail - Nissan 240SX 1991-1992 Workshop Manual

Rear and Side Rail

REAR AND SIDE RAIL

18-15

SIDE RAIL ASSEMBLY (cont’d)

INSTALL

1.

INSTALL SIDE RAIL ASSEMBLY TO REAR RAIL.

(a) Align side rail assembly to rear rail. (b) Apply Loctite (P/N 271 or equivalent) to bolt threads and install two (2) bushings and bolt. Torque: 17 Nm (13 ft. Ib.)

2.

INSTALL BALANCE LINK TO SIDE RAIL ASSEMBLY.

(a) Align balance link to side rail assembly. om : (b) Apply Loctite (P/N 271 or equivalent) to bolt threads and install two (2) bushings and bolt. Torque: 17 N-m (13 ft. Ib.)

3.

INSTALL SIDE RAIL ASSEMBLY TO NO. 1 BOW.

(a) Position side rail assembly to No. 1 bow. (b) Apply Loctite (P/N 271 or equivalent) to bolt threads and install four (4) bolts and nuts. n and Torque: 22 Nm (16 ft. Ib.)

4.

INSTALL CENTER LINK AND NO. 3 BOW ASSEMBLY TO

REAR RAIL.

(a) Position center link and No. 3 bow to rear rail. asher (b) Apply Loctite (P/N 271 or equivalent) to bolt threads and install three (3) bushings and bolt. sher and Torque: 17 Nm (13 ft. Ib.)

INER. #9.

INSTALL NO. 2 BOW TO CENTER RAIL.

(a) Align No. 2 bow control link slots to center rail pins. (b) Apply Loctite (P/N 2710r equivalent) to bolt threads and install two (2) bushings and bolt. Torque: 5 Nm (44 in. lb.)

Parts & tools for this job For Nissan 240SX

As an Amazon Associate we earn from qualifying purchases.